Alert  |  Search  |  Archive   
District   

Live NIT 114 New NIT (In Last 7 Days) 13 Opening in Coming 3 Days 19 Closing in Coming 3 Days 16 Archive 13768

Last Date of Application Last Date of Submission Title/Work Description Estimated Cost in Lakh More
BANKURA
13/08/201425/08/2014Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Joyrambati water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.1596.405Details
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Joypur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Kotulpur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Indus water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Nabakishore water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Rampur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Gangajalghati water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Jhantipahari water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Sarberia water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Kenjakura water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Sanabandh water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Charadihi water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Beliatore water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Sarenga water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Saltora water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Taldangra water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Patrasayer water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Onda water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Bishnupur S.D.Hospital water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Mukutmanipur-Khatra-Ranibandh water supply scheme Zone-I to Zone-II under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Mukutmanipur-Khatra-Ranibandh water supply scheme Zone-III to Zone-IV under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Mukutmanipur-Khatra-Ranibandh water supply scheme Zone-V to Zone-VI under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Mukutmanipur-Khatra-Ranibandh water supply scheme Zone-VII to Zone-VIII under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Simlapal water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Indpur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Raipur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Barjora water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Sonamukhi water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of B.S.M.C.H. water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Mukundapur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Mejhia water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Bikna water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Ashna(Katjuridanga) water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Chhotobirbhanpur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Saltora Bazar water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Moynapur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Karakdanga water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
Maintenance of pipeline distribution system, rising main, sluice valve, stand post etc. including operation of sluice valve of Gouripur water supply scheme under Bankura Division for 12 months from 01.9.14 to 31.08.15
BARDDHAMAN
22/07/201425/07/2014Sinking of 250mm. X 150mm.dia. Tube well 150 mtr. Deep by D.R.Rig method using M.S.pipe & fibre glass filter at Head works site for Water Supply Scheme for Amarun & its adjoining mouza (Zone-I), Block-Bhatar under Burdwan Division,P.H.E Dte. 7.562Details
Sinking of 250mm. X 150mm.dia. Tube well 150 mtr. Deep by D.R.Rig method using M.S.pipe & fibre glass filter at 2nd (Second) tube well site for Water Supply Scheme for Amarun & its adjoining mouza (Zone-I), Block-Bhatar under Burdwan Division,P.H.E Dte.
22/07/201428/07/20141. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Anukhal Water Supply Scheme Tube Well No.- 1 & 2N/ADetails
2. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Dewandighi Water Supply Scheme Tube Well No.- 1 & 2
3. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Palla Water Supply Scheme Tube Well No.- 1 & 2
4. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Saktigarh Water Supply Scheme Tube Well No.- 1/2
5. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Kotachandipur Water Supply Scheme Tube Well No.- 1 & 2
6. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Sajiara Water Supply Scheme Tube Well No.- 3.
7. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Bhatakul (Zone –I) Water Supply Scheme Tube Well No.- 1 & 2
8. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Bhatakul (Zone-II) Water Supply Scheme Tube Well No.- 1 & 2
9. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Gangatikuri Water Supply Scheme Tube Well No.- 1 & 2
10. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Rupganj Water Supply Scheme Tube Well No.- 1/2
11. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Sudpur Water Supply Scheme Tube Well No. – 1 & 2
12. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Kasiara Water Supply Scheme Tube Well No. – 1 & 2
13. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Sankari Water Supply Scheme Tube Well No. – 1 & 2
14. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Sagrai Water Supply Scheme Tube Well No. – 1 & 2
15. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Majhergram Water Supply Scheme Tube Well No. – 1 & 2
16. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Radhanagar Water Supply Scheme Tube Well No. – 1 & 2
17. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Kalyanpur Water Supply Scheme Tube Well No. – 1 & 2
18. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Naopara Water Supply Scheme Tube Well No. – 1 & 2
19. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Nadanghat Water Supply Scheme Tube Well No. - 1 & 2
20. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Mondalgram Water Supply Scheme Tube Well No. – 1.
21. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Mondalgram Water Supply Scheme Tube Well No. – 2 & 3
22. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Madanagar Water Supply Scheme Tube Well No. – 1 & 2
23. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Nandra Water Supply Scheme Tube Well No. – 1.
24. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Krishnabati (Head work) Water Supply Scheme Tube Well No. – 1.
25. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Krishnabati Water Supply Scheme Tube Well No. – 2 & 3
26. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Rayan Water Supply Scheme Tube Well No. – 1 & 2
27. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Rayan Water Supply Scheme Tube Well No. – 3 & 4
28. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Rayan Water Supply Scheme Tube Well No. – 5 & 6
29. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Dirghapra Water Supply Scheme Tube Well No. – 1 & 2
30. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Khetia Water Supply Scheme Tube Well No. – 1 & 2
31. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Natungram Water Supply Scheme Tube Well No. – 1 & 2
32. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Isufabad (Zone –I) Water Supply Scheme Tube Well No. – 1 & 2
33. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Isufabad (Zone –II) Water Supply Scheme Tube Well No. –1 & 2
34. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Isufabad (Zone –III) Water Supply Scheme Tube Well No. –1 & 2
35. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Balgana Water Supply Scheme Tube Well No. – 1 & 2
36. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Palasan Water Supply Scheme Tube Well No. -1 & 2
37. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Chandutia Water Supply Scheme Tube Well No. -1 & 2
38. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Eruar Water Supply Scheme Tube Well No. -1
39. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Eruar Water Supply Scheme Tube Well No. -2 & 3
40. Operation & Guarding arrangement of Pumping Machinery under un-manned operation at Kanksa (Ijjatganj) Water Supply Scheme Tube Well No. -1 & 2
24/07/201430/07/2014Extension of distribution system of ERUAR and its adjoining mouzas Water Supply Scheme under Burdwan Division,P.H.E Dte.(PHASE - I) 6.987Details
Approach Road and Land Development at P.H.2 campus of W/S Scheme for Madanagar and its adjoining mouzas under Burdwan Division,PHE Dte.
23/07/201430/07/20141. Operation & Guarding arrangement of Pumping Machinery under manned operation at Mougram (Zone-I) Water Supply Scheme Tube Well No.- 1. N/ADetails
2.Operation & Guarding arrangement of Pumping Machinery under manned operation at Mougram (Zone-I) Water Supply Scheme Tube Well No.- 2.
3. Operation & Guarding arrangement of Pumping Machinery under manned operation at Mougram (zone-II) Water Supply Scheme Tube Well No. - 1.
4. Operation & Guarding arrangement of Pumping Machinery under manned operation at Mougram (zone-II) Water Supply Scheme Tube Well No. - 2.
5.Operation & Guarding arrangement of Pumping Machinery under manned operation at Ganganandapur Water Supply Scheme Tube Well No. - 1.
6.Operation & Guarding arrangement of Pumping Machinery under manned operation at Ganganandapur Water Supply Scheme Tube Well No. - 2.
7.Operation & Guarding arrangement of Pumping Machinery under manned operation at Simlon (zone-II) Water Supply Scheme Tube Well No. - 1.
8.Operation & Guarding arrangement of Pumping Machinery under manned operation at Simlon (zone-II) Water Supply Scheme Tube Well No. - 2.
9.Operation & Guarding arrangement of Pumping Machinery under manned operation at Satgachi Water Supply Scheme Tube Well No.- 1.
10.Operation & Guarding arrangement of Pumping Machinery under manned operation at Satgachi Water Supply Scheme Tube Well No.- 2.
11.Operation & Guarding arrangement of Pumping Machinery under manned operation at Panuhat Water Supply Scheme Tube Well No.- 1.
12.Operation & Guarding arrangement of Pumping Machinery under manned operation at Panuhat Water Supply Scheme Tube Well No.- 2.
13.Operation & Guarding arrangement of Pumping Machinery under manned operation at Manteswar Water Supply Scheme Tube Well No. - 1.
14.Operation & Guarding arrangement of Pumping Machinery under manned operation at Manteswar Water Supply Scheme Tube Well No. - 2.
15.Operation & Guarding arrangement of Pumping Machinery under manned operation at Simlon (zone-I) Water Supply Scheme Tube Well No. - 1.
16.Operation & Guarding arrangement of Pumping Machinery under manned operation at Simlon (zone-I) Water Supply Scheme Tube Well No. - 2.
17.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kusumgram (Zone-I) Water Supply Scheme Tube Well No. - 1.
18.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kusumgram (Zone-I) Water Supply Scheme Tube Well No. - 2.
19.Operation & Guarding arrangement of Pumping Machinery under manned operation at Hatgobindapur Water Supply Scheme Tube Well No.- 1.
20.Operation & Guarding arrangement of Pumping Machinery under manned operation at Hatgobindapur Water Supply Scheme Tube Well No.- 2
21.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kanksa (Zone-II) Water Supply Scheme Tube Well No.- 1/2 .
22.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sajiara Water Supply Scheme Tube Well No.- 1.
23.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sajiara Water Supply Scheme Tube Well No.- 2.
24.Operation & Guarding arrangement of Pumping Machinery under manned operation at Galsi Water Supply Scheme Tube Well No.- 1.
25.Operation & Guarding arrangement of Pumping Machinery under manned operation at Galsi Water Supply Scheme Tube Well No.- 2/3.
26.Operation & Guarding arrangement of Pumping Machinery under manned operation at Bananabagram Water Supply Scheme Tube Well No.- 1.
27.Operation & Guarding arrangement of Pumping Machinery under manned operation at Bananabagram Water Supply Scheme Tube Well No.- 2.
28.Operation & Guarding arrangement of Pumping Machinery under manned operation at Barabelun Water Supply Scheme Tube Well No.- 1.
29.Operation & Guarding arrangement of Pumping Machinery under manned operation at Barabelun Water Supply Scheme Tube Well No.- 2.
30.Operation & Guarding arrangement of Pumping Machinery under manned operation at Parhati Water Supply Scheme Tube Well No.- 1.
31.Operation & Guarding arrangement of Pumping Machinery under manned operation at Parhati Water Supply Scheme Tube Well No.- 2.
32.Operation & Guarding arrangement of Pumping Machinery under manned operation at Srirampur Water Supply Scheme Tube Well No.- 1.
33.Operation & Guarding arrangement of Pumping Machinery under manned operation at Srirampur Water Supply Scheme Tube Well No. - 2.
34.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sridharpur Water Supply Scheme Tube Well No. - 1.
35.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sridharpur Water Supply Scheme Tube Well No. - 2.
36.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sinhari Water Supply Scheme Tube Well No.-1.
37.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sinhari Water Supply Scheme Tube Well No.-2.
38.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kanksa (Zone –I) Water Supply Scheme Tube Well No. - 1.
39.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kanksa (Zone –I) Water Supply Scheme Tube Well No. - 2.
40.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kusumgram (Zone-II) Water Supply Scheme Tube Well No. - 1.
41.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kusumgram (Zone-II) Water Supply Scheme Tube Well No. - 2.
42.Operation & Guarding arrangement of Pumping Machinery under manned operation at Singhi Water Supply Scheme Tube Well No.- 1.
43.Operation & Guarding arrangement of Pumping Machinery under manned operation at Singhi Water Supply Scheme Tube Well No.- 2.
44.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sasinara (Zone-I) Water Supply Scheme Tube Well No.- 1.
45.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sasinara (Zone-I) Water Supply Scheme Tube Well No.- 2.
46.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sasinara (zone-II) Water Supply Scheme Tube Well No.- 1.
47.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sasinara (zone-II) Water Supply Scheme Tube Well No.- 2.
48.Operation & Guarding arrangement of Pumping Machinery under manned operation at Satgachia (Zone-I) Water Supply Scheme Tube Well No.- 1.
49.Operation & Guarding arrangement of Pumping Machinery under manned operation at Satgachia (Zone-I) Water Supply Scheme Tube Well No.- 2.
50.Operation & Guarding arrangement of Pumping Machinery under manned operation at Satgachia (Zone-II) Water Supply Scheme Tube Well No.- 1.
51.Operation & Guarding arrangement of Pumping Machinery under manned operation at Satgachia (Zone-II) Water Supply Scheme Tube Well No.- 2.
52.Operation & Guarding arrangement of Pumping Machinery under manned operation at Bagila Water Supply Scheme Tube Well No.- 1.
53.Operation & Guarding arrangement of Pumping Machinery under manned operation at Bagila Water Supply Scheme Tube Well No.- 2.
54.Operation & Guarding arrangement of Pumping Machinery under manned operation at Samudragarh Water Supply Scheme Tube Well No.-1.
55.Operation & Guarding arrangement of Pumping Machinery under manned operation at Samudragarh Water Supply Scheme Tube Well No.-2.
56.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kaithan Water Supply Scheme Tube Well No. – 1.
57.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kaithan Water Supply Scheme Tube Well No. – 2.
58.Operation & Guarding arrangement of Pumping Machinery under manned operation at Talit – Simdal Water Supply Scheme Tube Well No. – 1.
59.Operation & Guarding arrangement of Pumping Machinery under manned operation at Talit – Simdal Water Supply Scheme Tube Well No. – 2.
60.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kaity Water Supply Scheme Tube Well No. – 1.
61.Operation & Guarding arrangement of Pumping Machinery under manned operation at Kaity Water Supply Scheme Tube Well No. – 2.
62.Operation & Guarding arrangement of Pumping Machinery under manned operation at Chotoboinan Water Supply Scheme Tube Well No. – 1.
63.Operation & Guarding arrangement of Pumping Machinery under manned operation at Chotoboinan Water Supply Scheme Tube Well No. – 2.
64.Operation & Guarding arrangement of Pumping Machinery under manned operation at Nababhat Water Supply Scheme Tube Well No. – 1.
65.Operation & Guarding arrangement of Pumping Machinery under manned operation at Nababhat Water Supply Scheme Tube Well No. – 2.
66.Operation & Guarding arrangement of Pumping Machinery under manned operation at Banpaskamarpar Water Supply Scheme Tube Well No. – 1.
67.Operation & Guarding arrangement of Pumping Machinery under manned operation at Banpaskamarpar Water Supply Scheme Tube Well No. – 2.
68.Operation & Guarding arrangement of Pumping Machinery under manned operation at Banpaskamarpar Water Supply Scheme Tube Well No. – 3.
69.Operation & Guarding arrangement of Pumping Machinery under manned operation at Raina Water Supply Scheme Tube Well No. – 1.
70.Operation & Guarding arrangement of Pumping Machinery under manned operation at Raina Water Supply Scheme Tube Well No. – 2.
71.Operation & Guarding arrangement of Pumping Machinery under manned operation at Shyamsundar Water Supply Scheme Tube Well No. – 1.
72.Operation & Guarding arrangement of Pumping Machinery under manned operation at Shyamsundar Water Supply Scheme Tube Well No. – 2.
73.Operation & Guarding arrangement of Pumping Machinery under manned operation at Jogeswardihi Water Supply Scheme Tube Well No. – 1.
74.Operation & Guarding arrangement of Pumping Machinery under manned operation at Jogeswardihi Water Supply Scheme Tube Well No. – 2.
75.Operation & Guarding arrangement of Pumping Machinery under manned operation at Champahati Water Supply Scheme Tube Well No. – 1.
76.Operation & Guarding arrangement of Pumping Machinery under manned operation at Champahati Water Supply Scheme Tube Well No. – 2.
77.Operation & Guarding arrangement of Pumping Machinery under manned operation at Khandoghosh Water Supply Scheme Tube Well No. – 1.
78.Operation & Guarding arrangement of Pumping Machinery under manned operation at Khandoghosh Water Supply Scheme Tube Well No. – 2.
79.Operation & Guarding arrangement of Pumping Machinery under manned operation at Khandoghosh Water Supply Scheme Tube Well No. – 3.
80.Operation & Guarding arrangement of Pumping Machinery under manned operation at Ketugram (Zone –II) Water Supply Scheme Tube Well No. –1.
81.Operation & Guarding arrangement of Pumping Machinery under manned operation at Ketugram (Zone –II) Water Supply Scheme Tube Well No. – 2.
82.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sonarudhra Water Supply Scheme Tube Well No. – 1.
83.Operation & Guarding arrangement of Pumping Machinery under manned operation at Sonarudhra Water Supply Scheme Tube Well No. – 2.
84.Operation & Guarding arrangement of Pumping Machinery under manned operation at Hat-Kalna Water Supply Scheme Tube Well No. – 1.
85.Operation & Guarding arrangement of Pumping Machinery under manned operation at Hat-Kalna Water Supply Scheme Tube Well No. – 2.
86.Operation & Guarding arrangement of Pumping Machinery under manned operation at Palita Water Supply Scheme Tube Well No. – 1.
87.Operation & Guarding arrangement of Pumping Machinery under manned operation at Palita Water Supply Scheme Tube Well No. – 2.
88.Operation & Guarding arrangement of Pumping Machinery under manned operation at Nasaratpur Water Supply Scheme Tube Well No. – 1.
89.Operation & Guarding arrangement of Pumping Machinery under manned operation at Nasaratpur Water Supply Scheme Tube Well No. – 2.
90.Operation & Guarding arrangement of Pumping Machinery under manned operation at Seharabazar Water Supply Scheme Tube Well No. – 1.
91.Operation & Guarding arrangement of Pumping Machinery under manned operation at Seharabazar Water Supply Scheme Tube Well No. – 2.
92.Operation & Guarding arrangement of Pumping Machinery under manned operation at Jougram Water Supply Scheme Tube Well No. – 1.
93.Operation & Guarding arrangement of Pumping Machinery under manned operation at Jougram Water Supply Scheme Tube Well No. – 2.
94.Operation & Guarding arrangement of Pumping Machinery under manned operation at Dignagar Water Supply Scheme Tube Well No. – 1.
95.Operation & Guarding arrangement of Pumping Machinery under manned operation at Dignagar Water Supply Scheme Tube Well No. – 2.
96.Operation & Guarding arrangement of Pumping Machinery under manned operation at Bhalki Water Supply Scheme Tube Well No. – 1.
97.Operation & Guarding arrangement of Pumping Machinery under manned operation at Bhalki Water Supply Scheme Tube Well No. – 2.
98.Operation & Guarding arrangement of Pumping Machinery under manned operation at Parulia Water Supply Scheme Tube Well No. – 1.
99.Operation & Guarding arrangement of Pumping Machinery under manned operation at Parulia Water Supply Scheme Tube Well No. – 2.
100.Operation & Guarding arrangement of Pumping Machinery under manned operation at Barwa Water Supply Scheme Tube Well No. – 1.
101.Operation & Guarding arrangement of Pumping Machinery under manned operation at Barwa Water Supply Scheme Tube Well No. – 2.
25/07/201431/07/2014Extension of distribution system of ERUAR and its adjoining mouzas Water Supply Scheme under Burdwan Division,P.H.E Dte.(PHASE - II) 17.102Details
Extension of distribution system of ERUAR and its adjoining mouzas Water Supply Scheme under Burdwan Division,P.H.E Dte.(PHASE - III)
Construction of Boundary wall with land development around 2nd T.Well Site of W/S Scheme for Palason & its adjoining mouzas of Raina-I Block Burdwan Sub-Division Burdwan Division,PHE Dte.
Balance work for laying Distribution main(UPVC)for NH Crossing through Culvert of Abujahati and its adjoining mouzas Water Supply Scheme under burdwan Division,PHE Dte.
25/07/201431/07/2014Supplying of C.I Sluice Valve, Specials for Laying Rising Main of Water Supply Scheme For Amra and its adjoining mouzas under Burdwan Division,PHE Dte.2nd CallN/ADetails
Supplying of CI Sluice Valve for distribution system(for UPVC Pipe line)of KASHIPUR and its adjoining mouzas Water Supply Scheme under Burdwan Division,PHE Dte.
Supplying of C.I Sluice Valve, Specials for Laying Rising Main of Water Supply Scheme For Palason and its adjoining mouzas under Burdwan Division,PHE Dte.2nd Call
Supplying of CI Sluice Valve for distribution system(for UPVC Pipe line)of ERUAR and its adjoining mouzas Water Supply Scheme under Burdwan Division,PHE Dte.
05/08/201408/08/2014Allied & Additional work for Laying distribution system of BALGONA and its adjoining mouzas Water Supply Scheme under Burdwan Division,PHE Dte.(Part-A/B). 17.658Details
Additional work for Laying distribution system of BALGONA and its adjoining mouzas Water Supply Scheme under Burdwan Division,PHE Dte.(Part-A/C).
Additional work for Laying distribution system of BALGONA and its adjoining mouzas Water Supply Scheme under Burdwan Division,PHE Dte.(Part-B/A)
Additional work for Laying distribution system of BALGONA and its adjoining mouzas Water Supply Scheme under Burdwan Division,PHE Dte.(Part-C)
28/07/201431/07/2014Supply Stationary Goods & other materials for Kalyaneswari Inspection Bunglow under RCFA Division-I, PHE Dte.N/ADetails
01/08/201407/08/2014Additional work for Construction of 20 nos S.S. Post & Construction of 1 no. Sluice Valve Chamber of Laying of distribution system with different. dia. UPVC pipes for extension of pipeline & Replacement of Existing damaged AC Pipes line with UPVC pipes covering Jaggeswardihi Mouza under Rejuvenation of Jaggeswardihi W/S. Scheme under Katwa Sub-Division,Burdwan Division, P.H.E. Dte. 0.908Details
04/08/201407/08/2014Construction of boundary wall including land development at 3rd tube well site of SERUA & its adjoining mouzas water supply scheme under Bhatar Block of Burdwan Division,PHE Dte(Near Poultry Farm). 15.090Details
Construction of boundary wall including land development at Head Works site of RASULPUR water supply scheme under Memari-I Block of Burdwan Division,PHE Dte(Road Side/Front Side)(Part-A)
Additional work for Laying distribution system and construction of concrete path of MONDALGRAM and its adjoining mouzas Water Supply Scheme under Burdwan Division,PHE Dte.
Laying distribution system of Sargachi,Indrapur & Haladharpur under MONDALGRAM and its adjoining mouzas water supply scheme under Burdwan Divn,PHE Dte(Part I)
24/07/201430/07/2014Guarding arrangement for the office of the Superintending Engineer, Central Circle, PHE. Dte. & Executive Engineer, Burdwan Division, PHE. Dte., Purta Bhavan, Second Floor, Sadarghat, Burdwan - 713103. [Period from 01.08.2014 to 31.07.2015]3.680Details
25/07/201431/07/2014Supplying of CI Sluice Valve for distribution system(for UPVC Pipe line)of AMRA and its adjoining mouzas Water Supply Scheme under Burdwan Division,PHE Dte.N/ADetails
Supplying of C.I Sluice Valve, Specials for Laying Distribution system of Water Supply Scheme For Uttar Radhakantapur and its adjoining mouzas under Burdwan Division,PHE Dte.
05/08/201408/08/2014Construction of boundary wall including land development at Head Works site of CHOTOBOINAN water supply scheme under Burdwan Division,PHE Dte(part-A). 15.943Details
Construction of Pump House cum chlorine room with sanitary and water supply arrangement of crackynature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 5.90 mtr X 4.10 mtr out to out)of water supply at Head Works Site of Alipur and its adjoining mouza under Burdwan Divn,PHE Dte.
Construction of boundary wall including land development at Head Works site of CHOTOBOINAN water supply scheme under Burdwan Division,PHE Dte(part-B).
Construction of Pump House cum chlorine room without sanitary and water supply arrangement of cracky nature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 4.10 mtr X 3.50 mtr out to out)of water supply scheme for ALIPUR and its adjoining mouza at 2nd T.W.Site under Burdwan Sub-Divn,of Burdwan Divn,PHE Dte.
07/08/201412/08/2014Construction of Pump House cum chlorine room with sanitary and water supply arrangement of cracky nature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 5.90 mtr X 4.10 mtr out to out)of water supply scheme at Head Works Site of AMARUN and its adjoining mouza(Zone-I) under Burdwan Divn,PHE Dte.19.281Details
Construction of Pump House cum chlorine room with sanitary and water supply arrangement of crackynature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 5.90 mtr X 4.10 mtr out to out)of water supply scheme at 2nd Tube Well Site of AMARUN and its adjoining mouza(Zone-I) under Burdwan Divn,PHE Dte.
Construction of Pump House cum chlorine room with sanitary and water supply arrangement of cracky nature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 5.90 mtr X 4.10 mtr out to out)of water supply scheme at Head Works Site of AMARUN and its adjoining mouza(Zone-II) under Burdwan Divn,PHE Dte.
Construction of Pump House cum chlorine room with sanitary and water supply arrangement of cracky nature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 5.90 mtr X 4.10 mtr out to out)of water supply scheme at 2nd Tube Well site of AMARUN and its adjoining mouza(Zone-II) under Burdwan Divn,PHE Dte.
23/07/201428/07/2014O-clock guarding arrangement providing Ex-Serviceman Personnels & General guard at Tube well site of Ajoy river at Bhaburia under Gourbazar-ichhapur & Jamgora-Jaganthpur piped W/s Scheme within Durgapur-Faridpur block dist-Burdwan under Durgapur W/S Division, PHE Dte (w.e.f 01.8.2014 to 31.01.2015) 12.643Details
Garden & Plantation for beautification of compound at Bhaburia H/W site under Gourbazar- Ichhapur Piped W/S Scheme under Durgapur W/S Division, PHE Dte
Construction of Cable treanch for newly service line of WBSEDCL at Bhaburia H/w site under Gourbazar-Ichhapur Piped W/S Scheme under DWSD PHE Dte
Construction of approch road & other allied works at Bhaburia H/w site under Gourbazar-Ichhapur Piped W/S Scheme under DWSD PHE Dte.
28/07/201405/08/20141.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Satgachia water supply scheme under Central Mechanical Division, PHE Dte. , Burdwan.11.052Details
2.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Banonabagram water supply scheme under Central Mechanical Division, PHE Dte. , Burdwan.
3.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Sehara water supply scheme under Central Mechanical Division, PHE Dte. , Burdwan.
4.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Saktigrah water supply scheme under Central Mechanical Division, PHE Dte. , Burdwan.
5.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Sankari water supply scheme under Central Mechanical Division, PHE Dte., Burdwan.
6.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Gopalpur water supply scheme under Central Mechanical Division, PHE Dte., Burdwan.
7.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Ganganandapur water supply scheme under Central Mechanical Division , PHE Dte. , Burdwan.
8.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Parulia water supply scheme under Central Mechanical Division, PHE Dte., Burdwan.
9.Internal power wiring incl. supply of necessary materials for new Laboratories (water testing) for Anukhal water supply scheme under Central Mechanical Division, PHE Dte., Burdwan.
28/07/201431/07/2014Maintenance of Garden & supply of plants, Seeds & tools at Office Complex of S.E. & Div. office under R.C.F.A. Part-II, Water Supply Scheme. (W.e.f: 01.08.2014 to 31.07.2015) 15.961Details
Maintenance of Garden & supply of plants, Seeds & tools at Kalyaneswari I.B. under R.C.F.A. Part-I, Water Supply Scheme. (W.e.f: 01.08.2014 to 31.07.2015)
Maintenance of Garden & supply of plants, Seeds & tools at Kalyaneswari Head Work Site under R.C.F.A. Part-I, Water Supply Scheme. (W.e.f: 01.08.2014 to 31.07.2015)
Maintenance of Garden & supply of plants, Seeds & tools at Darbardanga Head Work site under R.C.F.A. Part-II, Water Supply Scheme. (W.e.f: 01.08.2014 to 31.07.2015)
Maintenance of Garden at Nandi Head Work Site under R.C.F.A. Part-II, Water Supply Scheme. (W.e.f: 01.08.2014 to 30.09.2015)
25/07/201430/07/2014Day to day Guarding arrangement at Pansuili H/W site under RCFA, Part-III W/S Scheme under (Zone-I) (w.e.f 01.08.2014 to 31.07.2015)4.073Details
31/07/201407/08/2014Construction of Pump House cum chlorine room with sanitary and water supply arrangement of cracky nature of soil according to departmental drawing no.GWSS/EC/PHE/DRG-03/07-08 (size 5.90 mtr X 4.10 mtr out to out ) of water supply scheme for Mankar Zone-II and its adjoining mouzas at Durgapur sub division under Burdwan Division, PHE Dte. at T.W. No.-17.360Details
Construction of Pump House cum chlorine room without sanitary and water supply arrangement of cracky nature of soil according to departmental drawing no.GWSS/EC/PHE/DRG-03/07-08 (size 4.10 mtr X 3.50 mtr out to out ) of water supply scheme for Mankar Zone-II and its adjoining mouzas at Durgapur sub division under Burdwan Division, PHE Dte. At 2nd T.W. site.
BIRBHUM
01/08/201408/08/2014Operation and Guarding of Low Lift / Submersible Pumping Machinery at Ahamedpur Water Supply Scheme, Pump House No. – IN/ADetails
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Ahamedpur Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bolpur Hospital Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bolpur Hospital Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bara Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bara Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bara Water Supply Scheme, Pump House No. – III
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bhadrapur Zone - I Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bhadrapur Zone - I Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bhadrapur Zone - II Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bhadrapur Zone - II Water Supply Scheme, Pump House No.– II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Kirnahar Zone - II Water Supply Scheme, Pump House No. – I/II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Lavpur Zone - I Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Lavpur Zone - II Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Lavpur Zone - II Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Lavpur Zone - II Water Supply Scheme, Pump House No. – III
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Lohapur Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Lohapur Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Mathpalsa Water Supply Scheme (Old Tube Well)
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Mathpalsa Water Supply Scheme, (River Bed Tube Well)
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Mayureswar Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Mayureswar Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Margram Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Margram Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Margram Water Supply Scheme, Pump House No. – III
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Mollarpur Zone – I Water Supply Scheme at Amba
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Mollarpur Zone – I Water Supply Scheme at Block Compound
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Muraroi Hospital Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Muraroi Hospital Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Nalhati Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Nalhati Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Nasipur Water Supply Scheme, (Tube Well No. I / II)
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Paikar Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Paikar Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Purandarpur Water Supply Scheme (Old Tube Well)
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Prantik Water Supply Scheme, Pump House No. – I / II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Rampurhat Hospital Water Supply Scheme, (At Binodpur)
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Tarapith Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Tarapith Water Supply Scheme, Pump House No. – II
Operation and Guarding of Centrifugal Pumping Machinery at Bolpur Hospital Water Supply Scheme (Centrifugal Pump Only)
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Tilpara (S.D. Hospital) Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Purandarpur Water Supply Scheme (New Installation Pump House).
01/08/201408/08/2014Operation and Guarding of Low Lift / Submersible Pumping Machinery at Daronda Water Supply Scheme, Pump House No. – IIN/ADetails
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Daronda Water Supply Scheme, Pump House No. – III
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Kurumgram Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Kurumgram Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bishnupur Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Bishnupur Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Khujutipara Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Khujutipara Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Nachansa Water Supply Scheme, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Nachansa Water Supply Scheme, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Gopalpur Water Supply Scheme, Zone - I, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Gopalpur Water Supply Scheme, Zone - I, Pump House No. – II
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Gopalpur Water Supply Scheme, Zone - II, Pump House No. – I
Operation and Guarding of Low Lift / Submersible Pumping Machinery at Gopalpur Water Supply Scheme, Zone - II, Pump House No. – II
Operation and Guarding of High Lift Pumping Machinery at Hatgacha Improvement Water Supply Scheme
01/08/201411/08/2014Operation and Guarding of High Lift and Low Lift Pumping Machinery at Tejhati Water Supply Scheme in the District of Birbhum under Bolpur Mechanical Division, P.H.E.DteN/ADetails
Operation and Guarding of High Lift and Low Lift Pumping Machinery at Patharchapuri Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift and Low Lift Pumping Machinery at Nagori Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift and Low Lift Pumping Machinery at Data Baba Mazar Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift Pumping Machinery at Lavpur Zone – II Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift and Low Lift Pumping Machinery at Lavpur Zone – I Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift and Low Lift Pumping Machinery at Kaitha Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift and Low Lift Pumping Machinery at Kirnahar Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift and Low Lift Pumping Machinery at Atla Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift and Low Lift Pumping Machinery at Jamrand Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
01/08/201411/08/2014Operation and Guarding of High Lift, Low Lift Pumping Machinery and Sub Station at Nalhati Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.DteN/ADetails
Operation and Guarding of High Lift, Low Lift Pumping Machinery and Sub Station at Mollarpur Zone – II Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery and Sub Station at Pachiara Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery and Sub Station at Karidhya Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery and Sub Station at Rajgram Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery and Sub Station at Dubrajpur Water Supply Schemes in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
01/08/201411/08/2014Operation and Guarding of High Lift, Low Lift Pumping Machinery, Sub Station, separate switch room, transformer and gaseous chlorination plant at Rajnagar Water Supply Scheme in the District of Birbhum under Bolpur Mechanical Division, P.H.E.DteN/ADetails
Operation and Guarding of High Lift, Low Lift Pumping Machinery, Sub Station, separate switch room, transformer and gaseous chlorination plant at Dubrajpur Augmentation Water Supply Scheme in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery, Sub Station, separate switch room, transformer and gaseous chlorination plant at Narayanpur Water Supply Scheme in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery and gaseous chlorination plant at Laxminarayanpur Water Supply Scheme in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery and gaseous chlorination plant at Bansjhore Water Supply Scheme in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery, Sub Station and gaseous chlorination plant of Khoyrasole Water Supply Scheme (at Churror) in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery, Sub Station and gaseous chlorination plant of Hatgacha Water Supply Scheme in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift, Low Lift Pumping Machinery and gaseous chlorination plant of Tilpara and Adjoining Mouzas Water Supply Scheme in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
Operation and Guarding of High Lift Pumping Machinery and gaseous chlorination plant of Khoyrasole High Lift Water Supply Scheme (at Khoyrasole) in the District of Birbhum under Bolpur Mechanical Division, P.H.E.Dte
04/08/201414/08/2014Construction of platform and installation of India Mark – II hand pump Rig Bore Tube Well at different site of Birbhum District under Birbhum Mechanical Sub Division (Drilling) of Bolpur Mechanical Division, P.H.E.DteN/ADetails
04/08/201414/08/2014Supply and delivery of RH-500 Hammer for Drilling works at Birbhum Mechanical Sub Division (Drilling) under Bolpur Mechanical Division, P.H.E.Dte. N/ADetails
DAKSHIN DINAJPUR
28/07/201408/08/2014Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).29.994Details
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Kumarganj Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015). (06 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (05 Nos. spot source)
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at source less Anganwadi Centers located in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Source less Anganwadi Center : 2014 - 2015) (04 Nos. spot source)
30/07/201411/08/2014Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).16.192Details
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
Sinking of 100 mm X 40 mm diameter ground bored tube well assembly including 36 meter long 100 mm diameter Top Enlargement, 40 mm diameter well & blank pipes and 6.0 meter long 40 mm diameter well screen, tube well fitted with India Mark-II Pump for drinking water spot source to provide drinking water facility at various locations in Tapan Block of Dakshin Dinajpur District to meet scarcity of drinking water, to be implemented by Balurghat Division, PHED, Dakshin Dinajpur. (Honourable MLA Sri S.N. Roy, 2014 - 2015) (05 Nos. spot source).
24/07/201431/07/2014Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-I)N/ADetails
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-II)
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-III)
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-IV)
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-V)
24/07/201431/07/2014Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-VI)N/ADetails
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-VII)
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-VIII)
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-IX)
24/07/201431/07/2014
Corrigendum/
Addendum/
Cancel
Inter -Connection in between 1st & 2nd tube well and rising mains including delivery line with reservoir connection at Panjul Piped Water Supply Scheme at Hili Block under Balurghat Division ,PHED in the district of Dakshin Dinajpur10.677Details
Inter -Connection in between 1st & 2nd tube well and rising mains including delivery line with reservoir connection at Siala Piped Water Supply Scheme at Balurghat Block under Balurghat Division ,PHED in the district of Dakshin Dinajpur
Inter -Connection in between 1st & 2nd tube well and rising mains including delivery line with reservoir connection at Kalaibari Piped Water Supply Scheme at Balurghat Block under Balurghat Division ,PHED in the district of Dakshin Dinajpur
Trial run stablization and day to day operation ,efficient monitoring ,leakages/crackages/bursting/washing/flushing service reservoir/conduit, providing supply of safe derinking water un-interruptedly to stand posts/off takes during supply hours as the case may be ,making distribution system of Mahindra and its adjoining mouzas water supply scheme under Balurghat Division PHED [ Period from 01-08-2014 to 31-01-2015]
28/07/201404/08/2014Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-X)N/ADetails
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-XI)
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-XII)
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-XIII)
Preparation of Layout Plan of prop. Sub Surface water based piped water supply scheme for Flouride Affected Areas of Gangarampur Block (Zone-XIV)
DARJILING
21/07/201428/07/2014
Corrigendum/
Addendum/
Cancel
Operation & guarding of different Hospital W/S Schemes within the district of Coochbehar & Jalpaiguri under Northern Mechanical Division, P.H.E. Dte. [ As per Annexure ]. N/ADetails
21/07/201428/07/2014
Corrigendum/
Addendum/
Cancel
Operation & guarding of different Municipal W/S Schemes within the district of Coochbehar & Jalpaiguri under Northern Mechanical Division, P.H.E. Dte. [ As per Annexure ]. N/ADetails
21/07/201428/07/2014
Corrigendum/
Addendum/
Cancel
Operation & guarding of different W/S Schemes within the district of Darjeeling (Plains ) under Northern Mechanical Division, P.H.E. Dte. [ As per Annexure ]. N/ADetails
21/07/201430/07/2014
Corrigendum/
Addendum/
Cancel
Operation & guarding of different W/S Schemes within the district of Coochbehar under Northern Mechanical Division, P.H.E. Dte. [ As per Annexure ]. N/ADetails
21/07/201430/07/2014
Corrigendum/
Addendum/
Cancel
Operation & guarding of different W/S Schemes within the district of Jalpaiguri under Northern Mechanical Division, P.H.E. Dte. [ As per Annexure ].N/ADetails
21/07/201430/07/2014
Corrigendum/
Addendum/
Cancel
Operation & guarding of different W/S Schemes within the district of Jalpaiguri under Northern Mechanical Division, P.H.E. Dte. [ As per Annexure ]. N/ADetails
22/07/201422/07/2014
Corrigendum/
Addendum/
Cancel
Construction of additional Intake Structure along with RCC weir for feeding the newly laid 250 mm dia M.S. pipeline from Neorakhola to Dhaula Khola for tapping excess water of Neora Source for mitigating the shortfall in water supply during the lean period under Neorakhola W/S & Mtc. Div PHE Dte. Kalimpong.85.720Details
22/07/201422/07/2014
Corrigendum/
Addendum/
Cancel
Repair and Renovation of 85 m span steel pipe supporting structure between Dhaula to Dolay at Ch. No. 89-92 including necessary abutments and extra RCC post and necessary protection works under Neoakhola W/S & Mtc. Division, PHE, Dte, Kalimpong.80.404Details
05/08/201413/08/2014“ Supply & delivery of stand by Submersible Pump Motor set, Actuator operated Butterfly Valve as well as Autoatic PLC Panel for Tubewell No. II at CHOUHADDI W/S SCHEME , in the dist. of Jalpaiguri under Northern Mechanical Division, P.H.E. Dte,.”3.315Details
01/08/201406/08/2014Construction of 3.6 mtr. X 3.00 switch room with water supply and sanitary arrangements all complete for head work site for water supply to 10th Battilion Police campus at Dabgram including water supply and sanitary arrangement under Siliguri W/S Division, P.H.E. Dte.11.566Details
Construction of 3.6 mtr. X 3.00 switch room at 2nd Tubewell site for water supply to 10th Battilions Police campus at Dabgram under Siliguri W/S Division, P.H.E. Dte.
Laying of pipeline for water supply to the Batalions campus at Dabgram under Siliguri W/S Division, P.H.E. Dte.
Laying of rising main between pump to pump including pipe connections around head works site of water supply to the Battalions campus at Dabgram under Siliguri W/S Division, P.H.E. Dte.
23/07/201431/07/2014Supply & delivery of 125mm. dia. C.I.D.F. sluice valve PN-1.6 at Sub –Divisional Store at Sevoke Road, Siliguri under Siliguri Sub Division, P.H.E. Dte.N/ADetails
23/07/201431/07/2014Shifting of pipe line damaged due to construction of drain at Lokenath baba main road, Ward No.36 and connection of the same line with Loknath sarani of Siliguri Municipal W/S scheme, Zone-8B under Siliguri W/S Divn., P.H.E. Dte. 14.430Details
Construction special type sluice valve chambers for 350mm. dia. sluice valve at Pradhannagar of Zone-VI of Siliguri comprehensive W/S scheme under Siliguri W/S Divn., P.H.E. Dte.
Opening of two nos ports at the level of 104.00 MRL at the intake well of Siliguri Municipal W/S scheme at Mahananda river under Siliguri W/S Divn., P.H.E. Dte.
Realignment of pipe line for connection with inlet and delivery lines of reservoir and making bypass connection at the head work site of Siliguri Municipal W/S scheme Zone-X under Siliguri W/S Division, P.H.E. Dte.
Laying of RCC hume pipe across the road at Gajoldoba tourism park for laying of the pipe line under Gajoldoba mega tourism park W/S scheme.
Demarcation of different site at Zone-I & II under Gajoldoba tourism park under Siliguri W/S Division, P.H.E. Dte.
Construction of 3.6 mtr.X 3.00 switch room without water supply and sanitary arrange- ments all complete for 2nd tubewell at alternate site (Zone-II) for Gajoldoba tourism park (Rajganj block) W/S scheme under Siliguri W/S Division, P.H.E. Dte.
Additional work for Road, bridge, culvert, D rains etc. crossing for Uttar Ramdhan & adjoining mouzas W/S scheme under Siliguri Sub-Division, P.H.E. Dte. Part-G.
11/08/201411/08/2014Shifting and relaying of 500 mm dia C.I. transimision main pipeline in between chainage no. 612 to 630 (from Dolay to Lava) along Lava Damdim Raod in connection to GREF road upgradation programme in between KM 20 toKM 68.23.738Details
11/08/201411/08/2014Construction of RCC culvert at road crossing point at Chainage no 622-624 for crossing 500 mm dia C.I. transmission main in connection to widening of Lava Damdim Road under GREF road upgradation programme.in between KM 20 to KM 68.9.776Details
11/08/201411/07/2014PCC protection work at land sided area below track line at Chainage No 562 and repairing of track line at Chainage no 564 to 566 from Dolay towards Lava for safety of 500 mm dia transmission main pipeline.9.599Details
HAORA
18/07/201425/07/2014Operation and guarding of the pumping machinery at different water supply schemes, District - Howrah under Electrical Division PHE Dte. [As per Annexure – I]N/ADetails
HUGLI
21/07/201425/07/2014Supply & delivery of transformer & electrical accessories to WBSEDCL for effecting power connection at Mandra water supply scheme, P.H. No. - I, Hooghly.19.194Details
Supply & delivery of transformer & electrical accessories to WBSEDCL for effecting power connection at Mandra water supply scheme, P.H. No. - II, Hooghly.
Supply & Delivery of electrical accessories to WBSEDCL for effecting power connection at Zone - I, P.H. No. - I, Debanandapur Water Supply Scheme, Hooghly.
Supply & Delivery of electrical accessories to WBSEDCL for effecting power connection at Zone - I, P.H. No. - II, Debanandapur Water Supply Scheme, Hooghly.
Supply & Delivery of electrical accessories to WBSEDCL for effecting power connection at Zone - II, P.H. No. - I, Debanandapur Water Supply Scheme, Hooghly.
Supply & Delivery of electrical accessories to WBSEDCL for effecting power connection at Zone - II, P.H. No. - II, Debanandapur Water Supply Scheme, Hooghly.
18/07/201425/07/2014Operation and guarding of the pumping machinery at different water supply schemes, District - Hooghly under Electrical Division PHE Dte. [As per Annexure – I]N/ADetails
23/07/201430/07/2014Supply & Delivery at site Cast Iron ( C.I.) Detachable joint complete set of different diameter (80mm and 100 mm)as per current relevant IS codes (8794/1988) with latest amendment in codes including stacking at departmental store, packing charges, all taxes and duties as applicable and payable, Bolts, Nuts and rubber rings as per latest IS codes with latest amendment all complete as per direction of EIC. N/ADetails
KOLKATA
18/07/201425/07/2014Operation and guarding of the pumping machinery at Lalbazar water supply scheme, P.H. No. I, Kolkata under Electrical Division PHE Dte. N/ADetails
Operation and guarding of the pumping machinery at Lalbazar water supply scheme, P.H. No. II, Kolkata under Electrical Division PHE Dte.
Operation and guarding of sewarage pumping machinery at Poddar Park tenement scheme, Kolkata under Electrical Division, PHE Dte.
24/07/201424/07/2014
Corrigendum/
Addendum/
Cancel
1) Supply, delivery and installation of yard lighting arrangement and allied works at Head works site (pump house no-H.L), under Chandpara W/S scheme.2.006Details
07/08/201408/08/20141. Supply, delivery & installation of A.C. Machine at O.T.Complex of Panihati S.G. Hospital under Eastern Mechanical Division, Sub-Division-I P.H.E. Dte.4.424Details
06/08/201407/08/20141. Replacement of totally damaged 500 mm dia NRV (BS) on the delivery line of Pump House No. 2 Low Lift Pump House under Baranager-Kamarhati Jnt. water supply scheme. 2.453Details
05/08/201406/08/20141. Yard lighting arrangement alongwith renovation of temporary store & clearing of yard & allied works at Trimohini Head Works under Basirhat Aug. w/s scheme. 1.219Details
25/07/201430/07/20141) Supply, delivery & installation of 15 KVA, 3ph, unbalanced input, servo control Voltage Stabilizer of P/H no-II under Chandpara W/S Scheme under EMD, PHE Dte., Dist.-24 Pgs. (N)20.762Details
2) Supply, delivery & installation of 15 KVA, 3ph, unbalanced input, servo control Voltage Stabilizer of P/H no-III under Chandpara W/S Scheme under EMD, PHE Dte., Dist.-24 Pgs. (N)
3) Supply, delivery & installation of 25 KVA Voltage Stabilizer of P/H no-IV (Zone-II) under Berachampa W/S Scheme under EMD, PHE Dte., Dist.-24 Pgs. (N)
4) Supply, delivery & installation of 20 KVA Voltage Stabilizer of P/H no-II under Zafarpur W/S Scheme under EMD, PHE Dte., Dist.-24 Pgs. (N)
5) Supply, delivery & installation of 35 KVA Voltage Stabilizer of P/H no-II under Baduria Municipal W/S Scheme under EMD, PHE Dte., Dist.-24 Pgs. (N)
6) Supply, delivery & installation of 25 KVA Voltage Stabilizer of P/H no-I under Arsula W/S Scheme under EMD, PHE Dte., Dist.-24 Pgs. (N)
7) Supply, delivery & installation of 25 KVA Voltage Stabilizer of P/H no-I under Kachua-Swarupnagar W/S Scheme under EMD, PHE Dte., Dist.-24 Pgs. (N)
06/08/201408/08/20141. Supply, delivery & installation of 7.5 HP dewatering Submersible Pumping Machinery at CDDS Main Pumping Station Bangur.2.230Details
12/08/201414/08/20141. Yard lighting arrangement at P.H.No-I (Zone-II) under Dakshin Chatra W/S Scheme, Dist-24Pgs (N).3.438Details
01/08/201408/08/2014Annual maintenance and repairing of Departmental computers, peripherals & Plotter (Including supply of all necessary spares except cartridges & paper)under the office of the Superintending Engg, Planning Circle-I,PHE Dte.,PNB House,3rd floor, 18A, Brabourne Rd, Kolkata-700001.For 12 months. (As per schedule attached) per schedule attached) N/ADetails
MALDAH
21/07/201425/07/2014
Corrigendum/
Addendum/
Cancel
Providing Security Arrangement at Head Work site of Sujapur Distribution zone of Southern Sector , Malda Arsenic area W/S Scheme under Malda Mechanical Division, P.H.Engineering Directorate, Malda.N/ADetails
18/07/201425/07/2014 1 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Pry. & Uper Pry. School at English Bazar Block (5 Nos. Tube Well )" 95.625Details
2 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Pry. & Uper Pry. School at Gazole Block (6 Nos. Tube Well)"
3 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Pry. & Uper Pry. School at Old Malda, Habibpur, Bamongola Block (4 Nos. Tube Well)"
4 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Pry. & Uper Pry. School at Harishchandra pur - I & II Block (3 Nos. Tube Well)"
5 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Pry. & Uper Pry. School at Ratua- I & II Block (3 Nos. Tube Well)"
6 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Pry. & Uper Pry. School at Chanchal - I & II Block (3 Nos. Tube Well)"
7 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Harishchandra pur - I Block (4 Nos. Tube Well)"
8 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Harishchandra pur - I Block (4 Nos. Tube Well)"
9 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Harishchandra pur - I Block (4 Nos. Tube Well)"
10 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Harishchandra pur - I Block (6 Nos. Tube Well)"
11 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Chanchal-II Block (4 Nos. Tube Well)"
12 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Chanchal-II Block (4 Nos. Tube Well)"
13 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Chanchal-II Block (4 Nos. Tube Well)"
14 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Chanchal-II Block (4 Nos. Tube Well)"
15 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Bamongola Block (4 Nos. Tube Well)"
16 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Bamongola Block (4 Nos. Tube Well)"
17 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Bamongola Block (4 Nos. Tube Well)"
18 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Bamongola Block (4 Nos. Tube Well)"
19 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Bamongola Block (4 Nos. Tube Well)"
20 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Bamongola Block (4 Nos. Tube Well)"
21 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Bamongola Block (4 Nos. Tube Well)"
22 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Bamongola Block (4 Nos. Tube Well)"
23 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Harishchandra pur - II Block (6 Nos. Tube Well)"
24 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Harishchandra pur - II Block (6 Nos. Tube Well)"
25 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Harishchandra pur - II Block (6 Nos. Tube Well)"
26 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Old Malda Block (4 Nos. Tube Well)"
27 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Old Malda Block (4 Nos. Tube Well)"
28 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Old Malda Block (4 Nos. Tube Well)"
29 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 36.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at Old Malda Block (5 Nos. Tube Well)"
30 "New Sinking of 100mm.x40mm.dia. (Mark-II) Tube Well with 100 mm dia. Housing pipe up to 30.00 M depth at different Block under Malda Division, P.H.E.Dte. in the district of Malda. For Source less Anganwari Centre (Phase-I) at English Bazar Block (5 Nos. Tube Well)"
30/11/1999
Corrigendum/
Addendum/
Cancel
Operation & Maintenance of Mobile Water Treatment unit in the District of Uttar Dinajpur under Malda Mechanical Division, PHE Dte. N/ADetails
21/07/201425/07/2014
Corrigendum/
Addendum/
Cancel
Operation & Maintenance of Mobile Water Treatment unit in the District of Dakshin Dinajpur under Malda Mechanical Division, PHE Dte. N/ADetails
21/07/201425/07/2014
Corrigendum/
Addendum/
Cancel
Operation & Maintenance of Mobile Water Treatment unit in the District of Malda under Malda Mechanical Division, PHE Dte. N/ADetails
24/07/201431/07/2014A . Providing Drinking Water Supply in source less Primary Schools in Kaliachak-I, Kaliachak-II and Manikhcak, Blocks under Malda Arsenic Area W/S Divn. PHED. Taking connection from existing different surface Water Based Water Supply Schemes. (2 Nos. Schools) 13.596Details
B . Providing Drinking Water Supply in source less Primary Schools in Kaliachak-I, Kaliachak-II and Manikhcak, Blocks under Malda Arsenic Area W/S Divn. PHED. Taking connection from existing different surface Water Based Water Supply Schemes. (2 Nos. Schools)
C . Providing Drinking Water Supply in source less Primary Schools in Kaliachak-I, Kaliachak-II and Manikhcak, Blocks under Malda Arsenic Area W/S Divn. PHED. Taking connection from existing different surface Water Based Water Supply Schemes. (2 Nos. Schools)
D . Providing Drinking Water Supply in source less Primary Schools in Kaliachak-I, Kaliachak-II and Manikhcak, Blocks under Malda Arsenic Area W/S Divn. PHED. Taking connection from existing different surface Water Based Water Supply Schemes. (2 Nos. Schools)
E . Providing Drinking Water Supply in source less Primary Schools in Kaliachak-I, Kaliachak-II and Manikhcak, Blocks under Malda Arsenic Area W/S Divn. PHED. Taking connection from existing different surface Water Based Water Supply Schemes. (1 No. School)
F . Providing Drinking Water Supply in source less Primary Schools in Kaliachak-I, Kaliachak-II and Manikhcak, Blocks under Malda Arsenic Area W/S Divn. PHED. Taking connection from existing different surface Water Based Water Supply Schemes. (1 No. School)
24/07/201431/07/2014A . Supply of different dia Detachable (DT) Joint of Class 10 complete set as per P.H.E. specification, under Malda Arsenic Area W/S Divn. PHED. N/ADetails
B . Supply of different capacity PVC Water Storage Tank (Patton or Syntex made) with food grade coating inside at Ramchandrapur Arsenic Submission Water Supply Scheme under Malda Arsenic Area W/S Divn. PHED.
C . Supply of overall Desktop Components, Antivirus Installation, Establishing Wireless LAN Connection, Internet Set Up, Network Storage Device, Repair of Canon Xerox Machine & supply and installation of intercom system in the office of the Executive Engineer, Malda Arsenic Area W/S Divn. PHED.
28/07/201401/08/2014Providing Distribution Panel for the new office building (Ground Floor ) under construction at RWS office campus in the District of Malda under Malda Mechanical Division, P.H.E.Dte.N/ADetails
28/07/201401/08/2014Providing Outdoor Illumination at Talbangrua W/S Scheme (Head Works Site) in the District of Malda under Malda Mechanical Division, P.H.E.Dte.N/ADetails
28/07/201401/08/2014Providing Outdoor Illumination at Kadirpur W/S Scheme (Head Works Site) in the District of Malda under Malda Mechanical Division, P.H.E.Dte.N/ADetails
01/08/201406/08/2014A. Modification of distribution pipe line by GI pipe infringed due to construction of mother & child hub and construction of Radio Therapy Building Constructed by PWD at Malda Medical Collage & Hospital of Malda Sadar Hospital W/S Scheme under Malda Division, P.H.E.Dte. 1.086Details
01/08/201406/08/2014A. Laying Distribution pipe line for Piped Water Supply for Gazole Gazole B.D.O office to Bidrohi More under Gazole Water Supply Scheme under Malda Division, P.H.E.Dte. in the District of Malda 0.801Details
MURSHIDABAD
21/07/201428/07/2014Supply & delivery outdoor type Transformer & ACSR conductor with allied electrical & iron materials to WBSEDCL for effecting power supply at P/H No-I under Kayadanga W/S scheme , Block-Suti-II (C.C.C. Aurangabad) Dist- Murshidabad.9.323Details
Supply & delivery outdoor type Transformer & ACSR conductor with allied electrical & iron materials to WBSEDCL for effecting power supply at P/H No-II under Kayadanga W/S scheme , Block-Suti-II (C.C.C. Aurangabad) Dist- Murshidabad.
Supply & delivery ACSR conductor with necessary electrical & iron materials to WBSEDCL for effecting power supply at P/H No-II under Andua W/S scheme , Block-Farakka, Dist- Murshidabad.
21/07/201428/07/2014
Corrigendum/
Addendum/
Cancel
Supply & delivery ACSR conductor with necessary electrical & iron materials to WBSEDCL for effecting power supply at P/H No-I, II & III under Rejinagar (Takipur) W/S scheme , (C.C.C. Rejinagar), Dist- Murshidabad.14.259Details
Supply & delivery ACSR conductor with necessary electrical & iron materials to WBSEDCL for effecting power supply at P/H No-I, Zone-I under Sadhulhali W/S scheme , (C.C.C. Rejinagar), Dist- Murshidabad.
Supply & delivery outdoor type Transformer & ACSR conductor with necessary electrical & iron materials to WBSEDCL for effecting power supply at P/H No-II under Andulberia W/S scheme , (C.C.C. Rejinagar), Dist- Murshidabad.
Supply & delivery outdoor type Transformer & ACSR conductor with necessary electrical & iron materials to WBSEDCL for effecting power supply at P/H No-II, Zone-I under Jitpur W/S scheme , (C.C.C. Domkol), Dist- Murshidabad.
Supply & delivery of Polyfilm Roll for Mobile Water Treatment Unit under Mechanical/Electrical Division, Berhampore, Murshidabad.
24/07/201430/07/2014
Corrigendum/
Addendum/
Cancel
Operation and maintenance of distribution system and rising main pipeline of Katakopra Zone-I water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/201542.000Details
Operation and maintenance of distribution system and rising main pipeline of Katakopra Zone-II water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Herampur (Zone-I) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Herampur (Zone-II) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Narasinghapur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Bhatirathpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Karimpur-Jalangi Zone-I water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Karimpur-Jalangi Zone-II water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Faridpur Zone-I water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Karimpur-Jalangi Zone-III water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Faridpur Zone-II water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Khairamari water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of P.T. Rasulpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Katlamari water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Islampur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Nabipur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Domkal water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015 (IEP)
Operation and maintenance of distribution system and rising main pipeline of Malibari water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Godanpara Zone-I water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Godanpara Zone-II water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Momenpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
24/07/201428/07/2014Operation and maintenance of distribution system and rising main pipeline of Saktipur Zone-I water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/201553.350Details
Operation and maintenance of distribution system and rising main pipeline of Saktipur Zone-II water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Chhaighari water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Selamatpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Gangadhari water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Berhampore Municipality Zone-I water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Berhampore Municipality Zone-II water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Berhampore Municipality Zone-III water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Berhampore Municipality Zone-IV water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Berhampore Municipality Zone-V water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Budharpara water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Araji Madhupur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Beldanga Rural Hospital water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Hariharpara water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Choa water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Judupur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Rao J.N. Roy Hospital water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of New General Hospital water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Mahula water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Madda (Urban) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Chandpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Edrakpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Surangapur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Kismat-Imadpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
24/07/201428/07/2014Operation and maintenance of distribution system and rising main pipeline of Arjunpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/201533.800Details
Operation and maintenance of distribution system and rising main pipeline of Jangipur Municipality (Zone-I) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Jangipur Municipality (Zone-II) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Kankuria-Jafrabad water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Aurangabad water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Jagtai water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Sagardighi (Zone-I) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Sagardighi (Zone-II) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Mithipur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
- Operation and maintenance of distribution system and rising main pipeline of Ahiaran water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Sekendra water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Manigram-Balarambati water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Dhusaripara water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Mirzapur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Ramakantapur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Jangipur S.D. Hospital water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
24/07/201428/07/2014Operation and maintenance of distribution system and rising main pipeline of Murshidabad Municipality water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/201521.500Details
Operation and maintenance of distribution system and rising main pipeline of Lalbagh SD Hospital water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Bhandara water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Kantanagar water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Habaspur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Amarkunda water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Sanyasidanga water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Lalbagh GAP Phase-II water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Jiaganj water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
24/07/201428/07/2014
Corrigendum/
Addendum/
Cancel
Operation and maintenance of distribution system and rising main pipeline of Bele water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/201522.400Details
Operation and maintenance of distribution system and rising main pipeline of Kandi SD Hospital water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Mahalandi (Zone-I) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Mahalandi (Zone-II) water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Salar water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Kakgram water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Simulia water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Dakshinkhanda water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Bahara water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Burwan water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Panchthupi water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Gobarhati water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
Operation and maintenance of distribution system and rising main pipeline of Bharatpur water supply scheme for 12 (twelve) months i.e. from 01/08/2014 to 31/07/2015
NADIA
14/07/201430/07/2014Supply of various electrical (U P S related) accessories with necessary mechanical supports in the various newly constructed laboratories and other establishments in the o/o Executive Engineer(Nadia Division), P H E Dte.N/ADetails
18/07/201425/07/20141. Extension upvc pipe line from plassey kadamtola to P.W.D office under Debagram Sub Division P,H,E,Dte.1.370Details
22/07/201425/07/20141. Operation and maintenance of distribution system and rising main pipe line (C.I/D.I/AC/UPVC of Nadia ZillaPorishod Water Supply Scheme Under P.H. Engineering Dte for the period 01-08-2014 to 31-07-2015.5.010Details
2. Operation Maintenance of Iron Elemination Plant under BadlangiPadmamala Zone-I Water Supply Scheme Under Chapra Block for The Period from 01-08-2014 to 31-07-2015.
25/07/201431/07/20141. Special repair and Renovation of Karimpur P.H.E. Rest Room in the Premises of Karimpur Water Supply Scheme at Karimpur” under Tehatta Sub-Division, PHE Dte.4.640Details
NORTH 24 PARGANAS
18/07/201425/07/2014Operation and guarding of the pumping machinery at different water supply schemes, District – North 24 Pgs. under Electrical Division PHE Dte. [As per Annexure – I]N/ADetails
22/07/201425/07/20141)Supply & installation of pumping machineries including Auto-cum-Manual Control panel and related accessories for T.W. at Chandiberia for EWS under NTK Project. 2)Supply & installation of pumping machineries including Auto-cum-Manual Control panel and related accessories for T.W. (Hd. works), AA-IIIC under NTK Project. 3)Supply & installation of pumping machineries including Auto-cum-Manual Control panel and related accessories for T.W. (Hd. works), AA-IIE under NTK Project.N/ADetails
21/07/201425/07/20141.Annual maintenance of Building Sanitary & Plumbing of Panihati State General Hospital under Barrackpore Sub - Division, P.H.E.Dte. w.e.f. 01/08/2014 to 31/07/2015.6.700Details
2.Annual maintenance of Building Sanitary & Plumbing of Naihati State General Hospital under Barrackpore Sub - Division, P.H.E.Dte. w.e.f. 01/08/2014 to 31/07/2015.
3.Annual maintenance of Sanitary & Plumbing only external of Bhatapara State General Hospital under Barrackpore Sub - Division, P.H.E.Dte. w.e.f. 01/08/2014 to 31/07/2015.
4.Annual maintenance of rising main pipeline (CI/DI/ACUPVC in the Collage of Medicine & Sagar Dutta Hospital at Kamarhati, P.S. Belgharia, Dt - N 24 PGS, Kol - 700058 under Barrackpore Sub - Division,P.H.E.Dte. w.e.f. 01/08/2014 to 31/07/2015.
31/07/201406/08/2014Extra works of Trenchless road crossing, dismantling, withdrawing and relaying brick flat soling, supplying of DIDS specials etc. related to the work “Laying of CI/DI/AC/MS/UPVC pipe line under Improvement of ground water based piped water supply scheme in Arsenic affected areas of Bilkanda & adjoining Mouzas under Barrackpore II Block of North 24 Parganas District (Zone-I)(Part-V)”.9.020Details
Trial run of laying UPVC pipe, stand post etc. under Gainpur water supply scheme of Bongaon Block.
Extra works of laying pipeline, construction of masonry valve chamber etc. at Jaminderpara related to the work “Laying of CI/DI/AC/MS/UPVC pipe line under Improvement of ground water based piped water supply scheme in Arsenic affected areas of Bilkanda & adjoining Mouzas under Barrackpore II Block of North 24 Parganas District (Zone-I).
Construction of Retaining wall by the side of the approach road of head works site of Improvement of Ground water based piped water scheme in Arsenic affected areas of Bilkanda & adjoining Mouzas at Bilkanda (Zone - II) at Muragacha under Barrackpore – II Block.
22/07/201428/07/2014Group-A Deployment of Typist Cum Computer Operators, Draftsman (Auto CAD) and Office Attendants on monthly basis at the office of the Executive Engineer, N-24 Pgs. W/S Divn.-II, PHE Dte.N/ADetails
Group-B Deployment of Typist Cum Computer Operators and Office Attendants on monthly basis at the office of the Assistant Engineer, Sub Divn.-I, under N-24 Pgs. W/S Divn.-II, PHE Dte.
Group-C Annual maintenance and repair of Departmental Computers & peripheral under the office of the Executive Engineer, North-24 Parganas W/S Division-II, PHE Dte. and Assistant Engineer, Sub Division-I, under North-24 Parganas W/S Division-II, PHE Dte.
04/08/201407/08/20141)Repairing and overhauling of HSC vertical executed Sewage pump Make Mather & Platt including supply of fast moving spares at ISLS-II (Pump No. 3) , AA-I under NTK Project. 2)Supply & laying of M.S. & CIDF pipes and allied works at Combined Sewage & Drainage Pumping Station in AA-IIE under NTK Project.N/ADetails
05/08/201408/08/2014Providing illumination arrangement at newly constructed hutment at Children Park in Eco Tourism Park under NTK Project.N/ADetails
04/08/201406/08/20141)Providing cleaning of sump & screen chamber at ISLS-II, AA-I under NTK Project. 2)Providing cleaning of sump & screen chamber at ISLS-I, AA-I under NTK Project. 3)Supply & installation of luminaries for hoarding at Jatragachi DPS under NTK Project. 4)Supply & delivery of standby submersible pumping machinery at DPS Point-C under NTK Project. 5)Repairing and overhauling of 11 KV H.T. breaker, dehydration of transformer oils, restoration of cable fault with supply, fixing of cable jointing kit and allied works at ISLS-I under NTK Project. N/ADetails
PASCHIM MEDINIPUR
15/07/201415/07/2014Attach fileN/ADetails
PURULIYA
24/07/201425/07/2014Hiring of 1 (one) no. luxury (BS-III) maxi cab with engine capacity less than or equal to 2000 CC under the disposal of the Project Advisor , PHE Dte, Government of West Bengal at KolkataN/ADetails
01/08/201405/08/2014Supply and fitting of curtains for windows and large openings at the office of the Project Management Unit under West Bengal Piped Water Supply Project (Purulia)N/ADetails
01/08/201406/08/2014Special protection of 250 mm dia collecting line from manifold to CWR over Patloi river under Manguria-Lalpur W/S Scheme.19.035Details
Supply, fitting and fixing of C.I. Bolted Collars, 100 mm dia M.S. pipe, different dia sluice valves on rising main and distribution line at Sonathol under Sonathol W/S Scheme.
Carriage of 150 mm dia DI pipe and M.S. casing for road crossing at different points of 150 mm dia DI rising main of Bathanbari W/S Scheme.
Withdrawing & relaying & repair of distribution system for Murulia & Madhubanpur under Improvement of Ramchandrapur W/S Scheme.
Balance work for laying distribution system by HDPE pipe line including all specials etc. under Rangamatia W/S Scheme.(Part-D/1)
Extra work of rising main (Part-A) at different areas under Arra W/S Scheme.
Pushing of 600 mm dia RCC precast pipe & 350 mm dia M.S. water carrier pipe by hydraulic jacking method at Narayangarh Village towards Bankura main road under Arra W/S Scheme.(Part-I)
Repairing & renovation of the damaged room apron & drain at Jamsol for Water Supply arrangement in connection with Laboratory under Raghunathpur Sub-Division, PHE Dte.
Balance work of construction of Laboratory Building (5.4m X 3.6 m) with Sanitary toilet including water supply arrangement at OHR site of Raghunathpur W/S Scheme of Raghunathpur-II Block.
SOUTH 24 PARGANAS
24/07/201430/07/2014As per attached file_NIT No.07_HQ -II_AD_2014-15_for the works of_Repair & Renovation of Ladies Toilet at 6th floor (Civil and S & P works) Research Building, CNCI Hospital, under Alipore Division, PHE Dte.from Bonafide, resourceful and experienced contractors having experience in same nature of works. N/ADetails
31/07/201406/08/2014Improvement and protection of Boundary Wall for Stacking of Pipes required for Surface Water based Water Supply Scheme-II (Kulpi & 9 others adjoining Blocks) of South 24-Parganas District, PHE Dte. at Daulatabad Store (Zone-16) under Surface Water based W/S Scheme in the Arsenic affected areas of South 24-Pgns. District.21.530Details
Bye-pass arrangement of UPVC pipeline damaged due to road widening programme of P.W.D. from Kriparampur to Gotalahat under Surface Water based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. District.
Repair of Pump House at Roypur-Hasanpur W/S Scheme under Sonarpur Block within the Command Area of Surface Water based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. District.
Face lifting of Bhagarathi & Panchali Inspection Bunglow and Raw Water Pump House at Dakhin Roypur Water Treatment Plant under South 24 Pargans W/S Division-I, P.H.E. Dte. under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South Parganas District.
Face lifting of entire Boundary wall, Fencing, Security guard room etc within the campus of Inspection Bunglow and entire Intake jetty Garden surroundings at Dakhin Roypur Water Treatment Plant under South 24 Pargans W/S Division-I, P.H.E. Dte. under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South Parganas District.
25/07/201404/08/2014N.I.T. No. – 03 / RSD / 2014 – 2015 of Laying of pipeline by UPVC pipe at Rajuakhaki Para by the site of Burning Ghat of Koutala W/S Scheme and Restoration of pipeline by UPVC pipe of Batishwar W/S Scheme under Raidighi Sub-Division of Alipore Division, P.H.E. Dte. Bonafide, Resourceful, Experienced working Contractors of PHE Dte., having experience in same nature of works.6.349Details
05/08/201408/08/2014Water proofing treatment work including repair / replacement of waste water pipe for the part of the building 33 & 33/1, Chetla Central Road, Kolkata – 700027 (offices portion only).N/ADetails
Interested person can register themselves in order to receive tender publication notification through e-mail.    Registration  |  Login