Alert  |  Search  |  Archive   
District   

Live NIT 68 New NIT (In Last 7 Days) 3 Opening in Coming 3 Days 27 Closing in Coming 3 Days 27 Archive 11175

Last Date of Application Last Date of Submission Title/Work Description Estimated Cost in Lakh More
BARDDHAMAN
20/06/201326/06/2013Construction of pump House cum chlorine room without sanitary and water supply arrangement of cracky nature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 4.10 mtr X 3.50 mtr out to out)of water supply scheme for Usufabad and its adjoining mouza(Zone) – I)at 2nd tube well site under Burdwan Sub-Division of Burdwan Division,PHE Dte.7.646Details
Construction of pump House cum chlorine room without sanitary and water supply arrangement of cracky nature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 4.10 mtr X 3.50 mtr out to out)of water supply scheme for Usufabad and its adjoining mouza(Zone– II)at 2nd tube well site under Burdwan Sub-Division of Burdwan Division,PHE Dte.
Construction of pump House cum chlorine room without sanitary and water supply arrangement of cracky nature of soil according to departmental drawing No.GWSS/EC/PHE/DRG-03/07-08(size 4.10 mtr X 3.50 mtr out to out)of water supply scheme for Usufabad and its adjoining mouza(Zone– III)at 2nd tube well site under Burdwan Sub-Division of Burdwan Division,PHE Dte.
17/06/201325/06/20131.a) Supply & Installation of Submersible Pumping Machinery along with unmanned operational panel for Tube well no.- 1 at Nandai Water Supply Scheme, Dist. – Burdwan.35.781Details
1.b) Supply and installation of Voltage Correcting Device for Tube well No.-1 at Nandai Water supply Scheme under Central Mech. Divn. PHE. Dte.
2.a) Supply & Installation of Submersible Pumping Machinery along with unmanned operational panel for Tube well no.- 2 at Nandai Water Supply Scheme, Dist. – Burdwan.
2.b) Supply and installation of Voltage Correcting Device for Tube well No.-2 at Nandai Water supply Scheme under Central Mech. Divn. PHE. Dte.
3.a) Supply & Installation of Submersible Pumping Machinery along with unmanned operational panel for Tube well no.- 3 at Nandai Water Supply Scheme, Dist. – Burdwan.
3.b) Supply and installation of Voltage Correcting Device for Tube well No.-3 at Nandai Water supply Scheme under Central Mech. Divn. PHE. Dte.
4.a) Supply & Installation of Submersible Pumping Machinery along with unmanned operational panel for Tube well no.- 4 at Nandai Water Supply Scheme, Dist. – Burdwan.
4.b) Supply and installation of Voltage Correcting Device for Tube well No.-4 at Nandai Water supply Scheme under Central Mech. Divn. PHE. Dte.
5.Providing disinfection arrangement for Tube Well No. 1, 2. 3 & 4 at Nandai water supply scheme (Head Work Site) under Central Mechanical Division P.H.E. Dte.
20/06/201328/06/20131.a) Supply & Installation of Submersible Pumping Machinery along with unmanned operational panel for Tube well no.- 1 at Balgana Water Supply Scheme, under Central Mech. Divn. PHE Dte. Burdwan.21.588Details
1.b) Supply and installation of Voltage Correcting Device for Tube well No.-1 of Balgana Water supply Scheme under Central Mech. Divn. PHE. Dte.
2. a) Supply & Installation of Submersible Pumping Machinery along with unmanned operational panel for Tube well no.- 2 at Balgana Water Supply Scheme, under Central Mech. Divn. PHE Dte. Burdwan.
2.b) Supply and installation of Voltage Correcting Device for Tube well No.-2 of Balgana Water supply Scheme under Central Mech. Divn. PHE. Dte.
3. Supply & Installation of Submersible Pumping Machinery along with unmanned operational panel for Tube well no.- 1 at Kanksa, Zone -2, (Ijjatganj Head Works site) Water Supply Scheme, under Central Mech. Divn. P.H.E. Dist. – Burdwan.
11/06/201319/06/2013Sinking of 200mm. x 150mm. dia. Tube well 150mtr. deep by D.R. Rig method using M.S. pipe & Fibre Glass Strainer at Head Works site & 2nd tube well site for Water Supply Scheme for CHANDUTIA and its adjoining mouzas under Burdwan Division, PHE. Dte. [For 2 (two) Nos. Tube well].6.833Details
25/06/201305/07/20131.Construction of Platform and Installation of India Mark-II Hand Pump Rig Bore Tube Well Spillover 2012-13, Phase -II at different site of ten blocks of Burdwan District at Burdwan Mechanical Sub-Division (Drilling) under Central Mechanical Division PHE. Dte.4.947Details
19/06/201326/06/2013
Corrigendum/
Addendum/
Cancel
Operation & Maintainance of 450/400/200/100 mm dia DI/CI/GI Raising Main & other allied works from Pansuili head work site to Nutandanga Over Head Reservoir & Nutandanga ,Gogla, Bulk Supply points for ECL up to MIC more under RCFA, Part-III W/S Scheme including Guarding arrangement at Pansuili Store/Stackyard under RCFA ,Part-III W/S Scheme(Zone-I) (w.e.f 01.08.2013 to 31.07.2014) (Pt-A)(SL-1)60.400Details
Operation & Maintainance of 400/300/250/150 mm dia DI/CI/GI Raising Main & other allied works from Pansuili head work site to Madhaiganj,Loudoha Over Head Reservoir Bulk Supply points no-05,8,7 & 9 from MIC More to Madhaiganj OHR & MIC More to BSP 5/8/7 & 9 under RCFA, Part-III W/S Scheme including Guarding arrangement at Laudoha Store/Stackyard (OHR site) under RCFA ,Part-III W/S Scheme(Zone-I) (w.e.f 01.08.2013 to 31.07.2014) (Pt-B)
Operation & Maintenance including emergency repairing & restoration of distribution system of Nutandanga , Pansuili,Lashkarbandh & its adjoining areas within Nutandanga distribution area under RCFA ,Part-III Water Supply Scheme(w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Gogla Madarboni & its adjoining areas within Nutandanga distribution area under RCFA ,Part-III Water Supply Scheme .(w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Kalikapur ,Balijhuri & its adjoining areas within Loudoha distribution area under RCFA ,Part-III Water Supply Scheme (w.e.f 01.08.2013 to 31.07.2014).
Operation & Maintenance including emergency repairing & restoration of distribution system of Nabaghanapur,Tilaboni & its adjoining areas within Loudoha distribution area under RCFA ,Part-III Water Supply Scheme (w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Konda ,Gobindapur ,Deslopa,Rasikdanga,Bonagram & Madhaipur village & its adjoining areas within Nutandanga distribution area under RCFA ,Part-III Water Supply Scheme.(w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Laudoha,Sirsha (Kuchdihi Village), Palashboni village & its adjoining areas within Loudoha distribution area under RCFA ,Part-III Water Supply Scheme.(w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Dannaya ,Mohal & its adjoining areas within Nutandanga distribution area under RCFA ,Part-III Water Supply Scheme (w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Madhaiganj,Khatgoria ,Bargoria & Kantaberia & its adjoining areas within Madhaiganj distribution area under RCFA ,Part-III Water Supply Scheme .(w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Nakrakonda village starting from Nabaghanapur More to Nakrakonda village & its adjoining areas within Laoudoha distribution area under RCFA ,Part-III Water Supply Scheme (w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Kendula village starting from Pratabpur Grampanchayet More to Kendula village & its adjoining areas within Madhaiganj distribution area under RCFA ,Part-III Water Supply Scheme.(w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system at Rangamati Village & its adjoining areas within Madhaiganj distribution area under RCFA ,Part-III Water Supply Scheme (w.e.f 01.08.2013 to 31.07.2014)
Operation & Maintenance including emergency repairing & restoration of distribution system of Ramnagar village under Dalurbandh mouza & its adjoining areas including water supply to ECL BSP at Dalura & Dalurbandh under RCFA ,Part-III Water Supply Scheme including Guarding arrangement at Ramnagar /Dalurbandh headwork site under RCFA ,Part-III W/S Scheme(Zone-II) (Zone-II).(w.e.f 01.08.2013 to 31.07.2014)
Day to Day Operation & Maintenance of post Chlorination plant at Pansuili Headwork site under RCFA,Part-III W/S Scheme(w.e.f 01.08.2013 to 31.07.2014)
Day to Day Operation & Maintenance of post Chlorination plant at Ramnagar Headwork site (Zone-II) under RCFA,Part-III W/S Scheme(w.e.f 01.08.2013 to 31.07.2014)
Day to Day maintenance of Garden & Plants within Pansuili headwork site under RCFA Part-III W/S Scheme (w.e.f 01.08.2013 to 31.07.2014)
Day to Day maintenance of Garden & Plants within Ramnagar headwork site under RCFA Part-III W/s Scheme(w.e.f 01.08.2013 to 31.07.2014)
17/06/201321/06/2013Laying interconnection between tube well no. 1 & 2 of SEHERA Water Supply Scheme, Raina - II Block, under Burdwan Division, PHE. Dte.1.567Details
19/06/201325/06/2013Maintenance of pipe line including rising main and distribution system, sluice valve, S.S post, etc. including operation of sluice valve of Dewandighi Mirjapur water supply scheme under Burdwan Division , PHED. (For the period from 01.07.2013. to 30.06.2014.)38.300Details
- Do- - - - Shridhapur------- Do -.
- Do- - - - Shyamsundar------- Do -.
- Do- - - - Talit- simdal------- Do -.
- Do- - - - Parhati------- Do -.
- Do- - - - Hatgobindapur------- Do -.
- Do- - - - Jaugram------- Do -.
- Do- - - - Kaity------- Do -.
- Do- - - - Sagrai------- Do -.
- Do- - - - Bagila------- Do -.
- Do- - - - Barabelun------- Do -.
- Do- - - - Sankari------- Do -.
- Do- - - - Nababhat------- Do -.
- Do- - - - Palla------- Do -.
- Do- - Satgachia ( Zone – I)- Do -.
- Do- - Satgachia ( Zone – II)- Do -.
- Do- - Chhora ( Zone – I)- Do -.
- Do- - Chhora ( Zone – II)- Do -.
- Do- - - - Barwa------- Do -.
- Do- - - - Sasinara (Zone – I)------- Do -.
- Do- - - - Sasinara (Zone – II)------- Do
- Do- - - - Dignagar------- Do
- Do- - - - Chhotobainan------- Do -.
- Do- - - - Sehara------- Do -.
- Do- - - - Bananabagram------- Do -.
- Do- - - - Banpas- Kamarpara------- Do
- Do- - - - Raina------- Do -.
- Do- - - - Bhatar------- Do -.
- Do- - - - Khandaghosh------- Do -.
- Do- - - - Saktigarh------- Do -.
- Do- - - - Bhalki------- Do -.
- Do- - - - Bhatakul ( Zone-I )------- Do -.
- Do- - - - Bhatakul ( Zone-II )------- Do -.
19/06/201326/06/2013
Corrigendum/
Addendum/
Cancel
Operation and Maintenance of 12.09 MLD capacity Water Treatment Plant at Kamalnagar under Surface Water Based W/S. Scheme under Arsenic Affected Areas of Purbasthali – II Block under Burdwan Division, PHE. Dte. [Period from 01.07.2013 to 30.06.2014]15.612Details
18/06/201320/06/2013Mtc. of pipeline including rising main & dist. system, sluice valve, S.S. posts etc. including operation of sluice valves of Panuhat W/S. Scheme under Katwa Sub-Divn., PHE. Dte. [Period from 01.07.2013 to 30.06.2014]12.500Details
-Do- -Do- Gangatikuri W/S. Scheme -Do- -Do-
-Do- -Do- Ketugram W/S. Scheme -Do- -Do-
-Do- -Do- Sudpur W/S. Scheme -Do- -Do-
-Do- -Do- Koithan W/S. Scheme -Do- -Do-
-Do- -Do- Singhi W/S. Scheme -Do- -Do-
-Do- -Do- Mougram (Zone - I) W/S. Scheme -Do-
-Do- -Do- Mougram (Zone - II) W/S. Scheme -Do-
-Do- -Do- Palita W/S. Scheme -Do- -Do-
-Do- -Do- Jaggeswardihi W/S. Scheme -Do-
-Do- -Do- Kashiara W/S. Scheme -Do- -Do-
19/06/201324/06/2013Operation & Maintenance of pipeline including rising main and dist. system, sluice valve, S.S. posts etc. including operation of sluice valve of Simlon (Zone - I & II) W/S. Scheme under Kalna Sub-Division under Burdwan Divn., PHE. Dte. [Period from 01.07.2013 to 30.06.2014]36.290Details
-Do- -Do- Nasaratpur W/S. Scheme -Do- -Do-
-Do- -Do- Sinhari W/S. Scheme -Do- -Do-
-Do- -Do- Hatkalna W/S. Scheme -Do- -Do-
-Do- -Do- Radhanagar-Bagnapara W/S. Scheme -Do-
-Do- -Do- Kusumgram W/S. Scheme -Do- -Do-
-Do- -Do- Srirampur W/S. Scheme -Do- -Do-
-Do- -Do- Sajiara W/S. Scheme -Do- -Do-
-Do- -Do- Manteswar W/S. Scheme -Do- -Do-
-Do- -Do- Ganganandapur W/S. Scheme -Do- -Do-
-Do- -Do- Samudragarh W/S. Scheme -Do- -Do-
-Do- -Do- Champahati W/S. Scheme -Do- -Do-
-Do- -Do- Parulia W/S. Scheme -Do- -Do-
-Do- -Do- Majhergram W/S. Scheme -Do- -Do-
-Do- -Do- Satgachi W/S. Scheme -Do- -Do-
-Do- -Do- Anukhal W/S. Scheme -Do- -Do-
-Do- -Do- Sonarudra W/S. Scheme -Do- -Do-
Operation & Mtc. of dist. system, Sluice valves, S.S. posts etc. including operation of sluice valve of Zone - I portion (Charchuadanga) consisting of Majida & Uttar Lakshmipur Mouzas (Approx Length = 23 KM) of Surface water based W/S. Scheme for Arsenic Affected Areas of Purbasthali - II Block under Burdwan Divn., PHE. Dte. [Period from 01.07.2013 to 30.06.2014]
Operatio & Mtc. of Dist. system, sluice valves, S.S. posts etc. including operation of sluice valves of Zone - I portion (Charchuadanga) consisting of Simla, Mertala, Charchuadanga, Chandipur, Gupipur, Kuturia and Kamalnagar mouzas (Approx Length = 28 KM) of Surface water based W/S. Scheme for Arsenic Affected Areas of Purbasthali - II Block under Burdwan Division, PHE. Dte. -Do-
Operation & Mtc. of dist. system, sluice valves, S.S. posts etc. including operation of sluice valves of Zone II portion (Dafarpota) (Approx Length = 21.5 KM) of -Do- -Do-
Operation & Mtc. of dist. system, sluice valves, S.S. posts etc. including operation of sluice valves of Zone III portion consisting of Uttar Srirampur, Kankhal, Madhupur, Nimdaha, Nakadaha, Jamalpur, Dubrajpur, Hapania, Pathangram, Gachha, Hatsuri, Harishpur, Chajjni etc. (Approx Length = 74 KM) of -Do- -Do-
Operation & Mtc. of dist. system, sluice valve, S.S. posts etc. including operation of sluice valves of Zone - IV portion consisting of Kuksimla, Sumuria, Bodhsaha, Kubazpur, Mukshimpara, Sangoshpara, Sardana, Dhitpur, Doghori, Lohachur, Bargachi, Baganchora & Muragacha etc. (Approx Length = 85 KM) -Do- -Do-
Operation & Mtc. of Raw water & clear water rising main including operation of sluice valves of Zone - I (Charchuadanga), Zone - II (Dafarpota), Zone - III (Nimdaha) & Zone - IV (Dhitpur) portion (Approx Length = 25.3 KM) -Do- -Do-
24/06/201328/06/2013Construction of Pump House cum chlorine room without sanitary and water supply arrangement including plinth protection and surface drain at Krishnabati (3rd Tube well site) for Krishnabati and its adjoining mouzas W/S. Scheme under Kalna Sub-Divn. under Burdwan Divn., PHE. Dte. (according to departmental drawing no-GWSS/EC/PHE/DRG-03/07-08 (Size 4.10 mtr x 3.50 mtr out to out) (Non cracky nature of soil).2.980Details
21/06/201327/06/2013Operation and maintenance of distribution system and rising main pipeline (CI/DI/AC/UPVC) of Kanksa Zone-I (Silampur) W/S scheme under Durgapur Sub-Division, P.H.E Dte. [Period from 01/07/2013 to 30/06/2014.]0.000Details
Operation and maintenance of distribution system and rising main pipeline (CI/DI/AC/UPVC) of Kota-Chandipur W/S scheme under Durgapur Sub-Division, P.H.E Dte. [Period from 01/07/2013 to 30/06/2014.]
BIRBHUM
18/06/201324/06/2013Maintenance of Meghdoot Inspection Bunglow Complex including Annex Rest shed and beautification of total campus including guarding of Administrative Building and Bunglow complex under Bolpur Mechanical Division, P.H.E. Dte.N/ADetails
18/06/201324/06/2013Operation, Maintenance and Guarding of Surul Water Treatment Plant and Low Lift pumping Machinery and allied works at the Surul Side of Bolpur Water Supply Project (kfw Assisted) under Bolpur Mechanical Division P.H.E. Dte., District Birbhum. N/ADetails
19/06/201325/06/2013Operation, Maintenance and Guarding of Eastern Water Treatment Plant and Low Lift pumping Machinery and allied works at the Eastern Side of Bolpur Water Supply Project (kfw Assisted) under Bolpur Mechanical Division P.H.E. Dte., District Birbhum. N/ADetails
19/06/201325/06/2013Operation, Maintenance and Guarding of Western Water Treatment Plant and Low Lift pumping Machinery and allied works at the Western Side of Bolpur Water Supply Project (kfw Assisted) including Water Quality Testing under Bolpur Mechanical Division P.H.E. Dte., District Birbhum. N/ADetails
DARJILING
19/06/201325/06/2013
Corrigendum/
Addendum/
Cancel
“ Round the clock Operation, Maintenance & Guarding of Pumping machinery, 500 KVA Sub-Station, lighting arrangement and other allied works at INTAKE PUMPING STATION, FULBARI under Siliguri Comprehensive W/S Scheme, Northern Mechanical Division, P.H.E. Dte, Siliguri.” N/ADetails
“ Round the clock Operation, Maintenance & Guarding of Pumping machinery, Sub-Station ( 500 KVA x 3 ), lighting arrangement and other allied works at FULBARI HEAD WORKS SITE, under Siliguri Comprehensive W/S Scheme, Northern Mechanical Division, P.H.E. Dte, Siliguri.”
“ Round the clock Operation, Maintenance & Guarding of Pumping machinery, Sub-Station ( 500 KVA x 2 ) , lighting arrangement including Gaseous Chlorination System and other allied works at JHANKAR INTERMEDIATE PUMPING STATION , under Siliguri Comprehensive W/S Scheme, Northern Mechanical Division, P.H.E. Dte, Siliguri.”
“ Round the clock Operation, Maintenance & Guarding of Pumping machinery, Sub-Station. (250KVA),Electrical accessories, Gaseous Chlorination including lighting arrangement at GROUND LEVEL RESERVOIR-I under Siliguri Comp. W/S Scheme with its Added area under NMD/PHED
“ Round the clock Operation , Maintenance & Guarding of Pumping machinery, Sub-Station ( 150 KVA), Electrical Equipments and disinfections arrangement with all allied accessories at GROUND LEVEL RESERVOIR-II for water supply from existing system of Siliguri Municipal Corporation to its Added area and Adjoining Rural areas in the dist. of Darjeeling ”.
HAORA
19/06/201325/06/2013Emergency supply & delivery of polyfilm roll for Mobile Treatment Unit placed for Howrah District under Electrical Division, PHE Dte.N/ADetails
HUGLI
06/06/201319/06/2013
Corrigendum/
Addendum/
Cancel
Supply & Installation of submersible pumping machinery and allied works for Chikrand water supply scheme (Zone – I, P.H. No. I), District – Hooghly.20.274Details
Supply & Installation of submersible pumping machinery and allied works for Chikrand water supply scheme (Zone – I, P.H. No. II), District – Hooghly.
Supply & Installation of submersible pumping machinery and allied works for Chikrand water supply scheme (Zone – II, P.H. No. I), District – Hooghly.
Supply & Installation of submersible pumping machinery and allied works for Chikrand water supply scheme (Zone – II, P.H. No. II), District – Hooghly.
07/06/201320/06/2013Supply & Installation of submersible pumping machinery and allied works for Saptagram water supply scheme ( P.H. No. I), District – Hooghly.15.205Details
Supply & Installation of submersible pumping machinery and allied works for Saptagram water supply scheme ( P.H. No. II), District – Hooghly.
Supply & Installation of submersible pumping machinery and allied works for Saptagram water supply scheme ( P.H. No. III), District – Hooghly.
10/06/201321/06/2013
Corrigendum/
Addendum/
Cancel
Improvement of power quality at Santoshpur water supply scheme (P.H. No. I), District – Hooghly.34.829Details
Improvement of power quality at Santoshpur water supply scheme (P.H. No. II), District – Hooghly.
Improvement of power quality at Bhastara water supply scheme (P.H. No. I), District – Hooghly.
Improvement of power quality at Bhastara water supply scheme (P.H. No. II), District – Hooghly.
Improvement of power quality at Chikrand water supply scheme (Zone – I, P.H. No. I), District – Hooghly.
Improvement of power quality at Chikrand water supply scheme (Zone – I, P.H. No. II), District – Hooghly.
Improvement of power quality at Chikrand water supply scheme (Zone – II, P.H. No. I), District – Hooghly.
Improvement of power quality at Chikrand water supply scheme (Zone – II, P.H. No. II), District – Hooghly.
Improvement of power quality at Saptagram water supply scheme (P.H. No. I), District – Hooghly.
Improvement of power quality at Saptagram water supply scheme (P.H. No. II), District – Hooghly.
Improvement of power quality at Saptagram water supply scheme (P.H. No. III), District – Hooghly.
11/06/201324/06/2013
Corrigendum/
Addendum/
Cancel
Supply & Installation of submersible pumping machinery and allied works for Mandaran water supply scheme (P.H. No. I), Block – Pandua, District – Hooghly.16.259Details
Supply & Installation of submersible pumping machinery and allied works for Mandaran water supply scheme (P.H. No. II), Block – Pandua, District – Hooghly.
19/06/201325/06/2013Emergency supply & delivery of polyfilm roll for Mobile Treatment Unit placed for Hooghly District under Electrical Division, PHE Dte.N/ADetails
JALPAIGURI
18/06/201321/06/2013 ‘’Installation of IEP for safe drinking water at JALPAIGURI CORRECTIONAL HOME including Design & Commissioning with 12 months operation & maintenance”.N/ADetails
19/06/201321/06/2013
Corrigendum/
Addendum/
Cancel
Design, Construction, Supply, Installation, Commissioning (Operation & Maintenance) including testing of 110.86m3 per hour capacity in 2(two) separate unit pressure type IEP with accessories for the work under AMBARI FALAKATA W/S Scheme under Jalpaiguri Division P.H.E. Dte.N/ADetails
Design, Construction, Supply, Installation, Commissioning (Operation & Maintenance) including testing of 109.46m3 per hour capacity in 2(two) separate unit pressure type IEP with accessories for the work under PORAPARA W/S Scheme under Jalpaiguri Division P.H.E. Dte.
Design, Construction, Supply, Installation, Commissioning (Operation & Maintenance) including testing of 83.46m3 per hour capacity in 2(two) separate unit pressure type IEP with accessories for the work under MAYNATOLI W/S Scheme under Jalpaiguri Division P.H.E. Dte.
Design, Construction, Supply, Installation, Commissioning (Operation & Maintenance) including testing of 68m3 per hour capacity in 2(two) separate unit pressure type IEP with accessories for the work under CHARERBARI W/S Scheme under Jalpaiguri Division P.H.E. Dte.
Design, Construction, Supply, Installation, Commissioning (Operation & Maintenance) including testing of 96.7m3 per hour capacity in 2(two) separate unit pressure type IEP with accessories for the work under CHAKIABHITA W/S Scheme under Jalpaiguri Division P.H.E. Dte.
Design, Construction, Supply, Installation, Commissioning (Operation & Maintenance) including testing of 70m3 per hour capacity in 2(two) separate unit pressure type IEP with accessories for the work under ARJIMARIA KAMALA PUKURI W/S Scheme under Jalpaiguri Division P.H.E. Dte.
Design, Construction, Supply, Installation, Commissioning (Operation & Maintenance) including testing of 116.73m3 per hour capacity in 2(two) separate unit pressure type IEP with accessories for the work under MOHIT NAGAR W/S Scheme under Jalpaiguri Division P.H.E. Dte.
20/06/201324/06/2013Supply of CIDF Sluice valve, Jeffy Coupling, CIAS/DF Specials including all incidental changes & free delivery at Jalpaiguri Divisional Stackyard in all respect for CHARERBARI & ADJOINING MOUZA W/S/ SCHEME2.408Details
KOLKATA
13/06/201321/06/2013Conducting Expenditure Audit of Divisions Under PHE Dte for programme Fund(Central & State Share) and Support Fund(Central Share) under NRDWP for the Financial Year 2012-13N/ADetails
MURSHIDABAD
17/06/201325/06/2013Sinking of tubewells by DTH/ combination Drilling at Farakka Block in Murshidabad District under Mechanical/Electrical Division, P.H.E. Dte.N/ADetails
NADIA
14/06/201320/06/2013
Corrigendum/
Addendum/
Cancel
Half yearly maintenance of Nadia Arsenic Civil Division-II office & compound including guarding (round the clock) Sweeping, cleaning, dusting and other miscellaneous work as per direction of EIC i.e (Office building & sanitary plumbing work) and payment will be made as per PWD/PHE Dte. schedule of rates on actual basis in the district of Nadia. Starting from 01.07.13 to 31.12.13) 2.660Details
24/06/201328/06/20131. Operation & maintenance of laying distribution system including rising main of Gongra water supply scheme under Nadia Arsenic Civil Division-II, PHE Dte. for the period starting from 01/07/13 to 30/09/13 (Three months)2.645Details
2. Operation & maintenance of laying distribution system including rising main of Maheshpur water supply scheme under Nadia Arsenic Civil Division-II, PHE Dte. for the period starting from 01/07/13 to 30/09/13 (Three months)
3. Operation & maintenance of laying distribution system including rising main of Tengra water supply scheme under Nadia Arsenic Civil Division-II, PHE Dte. for the period starting from 01/07/13 to 30/09/13 (Three months)
4. Operation & maintenance of laying distribution system including rising main of Bahirgachhi Zone-I water supply scheme under Nadia Arsenic Civil Division-II, PHE Dte. for the period starting from 01/07/13 to 30/09/13 (Three months)
5. Operation & maintenance of laying distribution system including rising main of Bahirgachhi Zone-II water supply scheme under Nadia Arsenic Civil Division-II, PHE Dte. for the period starting from 01/07/13 to 30/09/13 (Three months)
24/06/201327/06/2013Annual maintenance of outfall drain at Nabadwip Ganga Action Plan for removing sludge, mucks etc. by engaging daily mathor labour under Nadia Division, P.H.E. Dte. for one year (w.e.f. 01.07.2013 to 30.06.2014)3.720Details
NORTH 24 PARGANAS
11/06/201324/06/2013Supply & delivery of Clear Water pump spares at Mongal Pandey Water Treatment Plant under North 24 Pgs. Arsenic area water supply scheme.N/ADetails
12/06/201325/06/2013Supply & delivery of pump spares at Boosting Station – I, Madhabpur under North 24 Pgs. Arsenic area water supply scheme.N/ADetails
18/06/201324/06/2013Operation, maintenance of pumping machineries along with all electrical and mechanical ancillaries for raw water pump house, clear water pump house, sludge pump house and sub-station (1600 KVA, 6KV / 433V, Indoor type) of Mongol Pandey Water Treatment Plant at Palta under North 24Pgs Arsenic area water supply scheme.17.926Details
Operation, maintenance of entire external and internal illumination (except SCADA room, Audio Visual room and Surodhoni Inspection Bunglow) arrangement including approach road and sludge pond of Mongal Pandey Water Treatment Plant at Palta under North 24 Pgs. Arsenic area water supply scheme.
Operation and maintenance of pumping machineries along with all electrical & mechanical ancillaries for clear water pump house and substation (1000 KVA, 11KV / 433V, Indoor type) at Boosting Station–I, Madhabpur & clear water pump house and substation (500 KVA, 11KV / 433V, Indoor type) Boosting Station – II, Naksha under North 24 Pgs. Arsenic area water supply scheme.
13/06/201319/06/2013Group-A Construction of R.C.C Box Drain along Street No.568 of 65 mtr including 12 mtr culvert from NP AR 63 to NP AR 64 under AA-IIB of N.T.K. Project under PHE Dte.94.277Details
Group-B Construction of R.C.C Box Drain along Street No.568 of 84 mtr from NP AR 86/3 to NP AR 87 under AA-IIB of N.T.K. Project under PHE Dte.
Group-C Construction of R.C.C Box Drain along Street No.568 of 80mtr from NP AR-87 to NP AR 88 including 12 mtr culvert under AA-IIB of N.T.K. Project under PHE Dte.
Group-D Balance work for laying of D.I. 1000 mm dia pumping main for drainage at SLS/DPS-IV to existing Pumping main (inside the premises of SLS/DPS-IV) and existing pumping main to canal (in street no 568) including diversion of existing road at Action Area-IIB of N.T.K. Project under PHE Dte.
Group-E Extension of 200 mm dia SW pipe line with manholes for additional plots connecting street no. 646 & 651 and providing manholes on plot with street no. 628 at AA-IIC of NTK Project under P.H.E. Dte.
Group-F Land filling of low laying area with excavated earth from local water body and dressing, cleaning existing pond and others miscellaneous works at S.T.P. area of AA-IIC in NTK Project under P.H.E. Dte.
Group-G Protection of Embankment of road no. 376 of CBD area for laying work 1200mm dia M.S. drainage pumping main along the road of NTK Project under PHE Dte.
Group-H Development and beautification of the open space with Gardening and artificial water body etc. for the Head Works at Zone-X in AA-IIA of NTK Project under PHE Dte.
14/06/201321/06/2013Group-AConstruction of Tube well platform with cleaning existing drain of O.H.R. area at AA-IIC in N.T.K. Project under PHE Dte.56.367Details
Group-BConstruction of canal cross road over existing inside cannel, cleaning site and other ancillary works within STP area in AA-IIC of N.T.K. Project under PHE Dte.
Group-CSupplying of P.V.C. pipe for arrangement of water for laying, plantation at the premises of (31 MLD) STP including other allied workin AA-IIC of N.T.K. Project under PHE Dte.
Group-DPainting of boundary wall including of scraping & repairing of damaged plaster at S.T.P. area of AA-IIC in N.T.K. Project under PHE Dte.
Group-EConstruction of path way of 2nd Tube Well site at Zone-V & VI at AA-IID of N.T.K. Project under PHE Dte.
Group-FConstruction of path way connecting dead end of existing pathway of Zone-VI at AA-IID in N.T.K. Project under PHE Dte.
Group-GConstruction of Guard shade at Gate No.-2 for S.L.S. / D.P.S., Zone-VI at AA-IID in N.T.K. Project under PHE Dte.
Group-HConstruction of concrete paved road connecting with DPS screen chamber, Ramp of pump house, OHR wash out drain & entry slab side wall and other miscellaneous works at Zone-VI of AA-IID in NTK Project under P.H.E. Dte.
Group-ICleaning and repairing of Box drain including allied works along MAR from NP F2-F1/11 to G2-G1/7 in AA-IIE of NTK Project under PHE Dte. (Part -A).
Group-JCleaning and repairing of Box drain including allied works along MAR from NP G2-G1/7 to G2-G1/23 in AA-IIE of NTK Project under PHE Dte. (Part -B).
Group-KCleaning and repairing of Box drain including allied works along MAR from NP G2-G1/23 to UC2-DC1/11 in AA-IIE of NTK Project under PHE Dte. (Part -C).
Group-LCleaning and repairing of Box drain including allied works along MAR from NP UC2-DC1/11 to UC2-DC2/8 in AA-IIE of NTK Project under PHE Dte. (Part -D).
Group-MMaintenance of Garden at AA-IIF Tube Well site within the N.T.K. Project for Twelve Months at AA-IIF under North 24 Parganas W/S Division -II , PHE Dte.
Group-NCleaning and repairing of Box drain including allied works at street no. 374 & 370 of AA-IIF in NTK Project under PHE Dte.
Group-OElectrical works of Guard Room at Tube-well site, AA-IIF in NTK Project under PHE Dte.
Group-PElectrical works for Office Room at SLS site, AA-IIG in NTK Project under PHE Dte.
Group-QElectrical works for Guard Room at SLS site, AA-IIG in NTK Project under PHE Dte.
Group-RElectrical works for Chlorination Room at SLS site, AA-IIG in NTK Project under PHE Dte.
Group-SCleaning and repairing of Box drain including allied works at street no. 374 of AA-IIG in NTK Project under PHE Dte.
Group-TConstruction of cross bundh, Bullah Pilling and earth filling work at street no. 333 of CBD Area of NTK Project under PHE Dte.
Group-UProtection work for laying of sanitary sewage system by using NP-3 (modified spigot & socket type) pipe along MAR-1111 from node 7/1 to 5 & 5 to 1/2 of CBD area in NTK Project under PHE Dte.
Group-VCleaning of Box drain along arterial road no. 374 at CBD Area in NTK Project under PHE Dte.
Group-WMaintenance of Garden at 14 MLD STP at AA-IIB within the N.T.K. Project for Twelve Months under North 24 Parganas W/S Division -II , PHE Dte.
20/06/201328/06/2013GROUP-A: Laying of C.I./U.P.V.C pipe for Distribution line work and construction of UGR in Balaka Housing in AA-I under New Town Kolkata W/S. Divn.-I, P.H.E. Dte.27.174Details
GROUP-B: Laying of 300mm dia. D.I. Raising Main at Action Area-IIA to Over Head reservoir No.-10 under New Town Kolkata Water Supply Division-I, P.H.E. Dte.
19/06/201321/06/2013Hiring and operation of additional electrical motor driven dewatering pumps at Point A12 (Junction of Garland and Bagjola Canal) at Jatragachi under New Town Kolkata Project.N/ADetails
20/06/201324/06/2013Survey work of different water supply distribution system using Total Station Theodolite alongwith necessary Skilled / Unskilled personnel, Tools and Plants & machinery to complete the work at Action Area-I,II & III of New Town Kolkata Project for the period for 01.07.2013 to 30.06.2014 i.e. 1(one) year.N/ADetails
PASCHIM MEDINIPUR
26/12/201202/12/2013Attach file.N/ADetails
14/06/201320/06/2013
Corrigendum/
Addendum/
Cancel
Sinking of 100 mm X 40 mm dia. & 120 Mtr Depth INDIA Mark – II tube well at different ICDS (Anganwadi Centre) under GOPIBALLAVPUR-II Block in the District of Paschim Medinipur under Midnapore Division, P.H.E Dte. (No. of Tube well = 12 Nos.) 50.554Details
Sinking of 100 mm X 40 mm dia. & 120 Mtr Depth INDIA Mark – II tube well at different ICDS (Anganwadi Centre) under GOPIBALLAVPUR-I Block in the District of Paschim Medinipur under Midnapore Division, P.H.E Dte. (No. of Tube well = 10 Nos.)
Sinking of 100 mm X 40 mm dia. & 120 Mtr Depth INDIA Mark – II tube well at different ICDS (Anganwadi Centre) under SANKRAIL Block in the District of Paschim Medinipur under Midnapore Division, P.H.E Dte. (No. of Tube well = 10 Nos.)
Sinking of 100 mm X 40 mm dia. & 120 Mtr Depth INDIA Mark – II tube well at different ICDS (Anganwadi Centre) under BINPUR-I Block in the District of Paschim Medinipur under Midnapore Division, P.H.E Dte. (No. of Tube well = 15 Nos.)
Sinking of 100 mm X 40 mm dia. & 120 Mtr Depth INDIA Mark – II tube well at different ICDS (Anganwadi Centre) under JHARGRAM Block in the District of Paschim Medinipur under Midnapore Division, P.H.E Dte. (No. of Tube well = 15 Nos.)
14/06/201320/06/2013Supply, delivery and installation of Submersible Pumping Machineries and others Mechanical / Electrical ancillaries and auxiliaries for Tube Well No-I of Sartla Water Supply Scheme, block sabang in the district Paschim Medinipur under Midnapore Mechanical Division, P.H.E. Dte.N/ADetails
Supply, delivery and installation of Submersible Pumping Machineries and others Mechanical / Electrical ancillaries and auxiliaries for Tube Well No-II of Sartla Water Supply Scheme, block sabang in the district Paschim Medinipur under Midnapore Mechanical Division, P.H.E. Dte.
17/06/201325/06/2013Sinking of 2 (Two) Nos. 300 X 200 mm dia. & 175 Mtr Depth deep Tube well by Direct Rotary Method for Rejuvenation of Chandrakona Road Railway Station W/S Scheme (Zone-I) under Midnapore Division, PHE Dte. (No. of Tube well = 02 Nos.) 56.617Details
Sinking of 300 X 200 mm dia. & 175 Mtr Depth deep Tube well by Direct Rotary Method for Rejuvenation of Chandrakona Road Railway Station W/S Scheme (Zone-II) under Midnapore Division, PHE Dte. (No. of Tube well = 01 No.)
Sinking of 300 X 200 mm dia. & 200 Mtr Depth deep Tube well by Direct Rotary Method for KALMIJORE & its adjoining mouzas W/S Scheme at Head Work & 2nd Tube well Site within Daspur-I Block of Ghatal Sub-Division under Midnapore Division, PHE Dte. (No. of Tube well = 02 Nos.)
Sinking of 250 X 150 mm dia. & 150 Mtr Depth deep Tube well by Direct Rotary Method at Head Work, 2nd Tube well Site & 3rd Tube well Site for NARAYANBAR & its adjoining mouzas W/S Scheme under Midnapore Division, PHE Dte. (No. of Tube well = 03 Nos.)
14/06/201321/06/2013
Corrigendum/
Addendum/
Cancel
Attach File.N/ADetails
18/06/201326/06/2013
Corrigendum/
Addendum/
Cancel
Sinking of 100 mm X 40 mm dia. & 100 Mtr. Depth INDIA Mark – II tube well at different mouzas of Chakmakrampur Gram Panchayet under Kharagpur-II Block within Kharagpur Sub-Division under Midnapore Division, P.H.E Dte. (No. of Tube well = 14 Nos.) [PART-A] 24.038Details
Sinking of 100 mm X 40 mm dia. & 100 Mtr. Depth INDIA Mark – II tube well at different mouzas of Chakmakrampur Gram Panchayet under Kharagpur-II Block within Kharagpur Sub-Division under Midnapore Division, P.H.E Dte. (No. of Tube well = 10 Nos.) [PART-B]
Sinking of 100 mm X 40 mm dia. & 100 Mtr. Depth INDIA Mark – II tube well at different mouzas of Chakmakrampur Gram Panchayet under Kharagpur-II Block within Kharagpur Sub-Division under Midnapore Division, P.H.E Dte. (No. of Tube well = 10 Nos.) [PART-C]
PURULIYA
10/06/201308/07/2013
Corrigendum/
Addendum/
Cancel
Providing Engineering Consistency Service for Survey, Investigation, Design for Implementation of West Bengal Piped Water Supply Project (Purulia)N/ADetails
SOUTH 24 PARGANAS
12/06/201321/06/2013Operation and guarding of the pumping machinery driven by DG set at different pump houses of different water supply Scheme in the district of South 24pgs under South 24pgs Mechanical Division, PHE Dte.N/ADetails
12/06/201324/06/2013Operation and guarding of the electric operated auto/ manual control pumping machinery at different pump houses of different water supply Scheme in the district of South 24pgs under South 24pgs Mechanical Division, PHE Dte.N/ADetails
20/06/201327/06/2013Operation and Maintenance of distribution system and Rising Main Pipeline (CI/DI/AC/UPVC) etc. for different W/S Schemes under Diamond Harbour Sub-Division P.H.E. Dte.53.824Details
10/06/201321/06/2013
Corrigendum/
Addendum/
Cancel
AS PER ATTACHED FILES : NIT NO - 05/RSD/2013-14 & ATTACHED LIST OF WORKS for Operation & Maintenance of distribution system and rising main pipeline of different W/S Scheme under Raidighi Sub-Division of Alipore Division PHE Dte. 62.120Details
10/06/201321/06/2013
Corrigendum/
Addendum/
Cancel
Laying of pipeline, construction of valve chamber, street stand posts, repair renovation of street stand posts and platforms, valve chambers etc of Harindanga Water Supply Scheme at Falta Block under Diamond Harbour Sub Division under Alipore Division, South 24 Parganas as Rejuvenation programme of the scheme.5.731Details
Construction of culvert for the approach road of pump house no -3 of Harindanga Water supply scheme at Falta Block under Diamond Harbour Sub Division, under Alipore Division, PHE Dte
Pipe protection work at different areas of Harindanga Water supply scheme at Falta Block under Diamond Harbour Sub Division under Alipore Division, PHE Dte, South 24 Parganas as Rejuvenation programme of the scheme.
Repair and renovation of damaged stand post, valve chambers, construction of brick pillars for culvert crossing etc. as required as per actual site condition at Harindanga Water supply scheme at Falta Block under Diamond Harbour Sub Division, under Alipore Division, PHE Dte
19/06/201327/06/2013NIT is invited by the Assistant Engineer, Canning Sub-Division, PHE Dte. South 24 Parganas for the works of Operation and Maintenance of distribution system and Rising main pipeline (CI/DI/AC/UPVC) of different W/S scheme of different types of civil works i.e. Soil Investigation and Production cum Trial Boring etc. from the Un-Employed Engineering Co-operative/Enlisted Class IV/Bonafide, resourceful experienced Contractors of P.H.E. Dte., having experience in same nature of works.48.407Details
19/06/201326/06/2013AS PER ATTACHED FILES NIT_07_AD_2013-14 & ATTACHED LIST OF WORKS for the works of Engagement of Security Guard and Supervisor for different departmental Store & Hiring of Motor Launch etc. from Bonafide, resourceful and experienced contractors of P.H.E. Dte., having experience in same nature of works. 47.837Details
Interested person can register themselves in order to receive tender publication notification through e-mail.    Registration  |  Login