• Bharat Nirman
 
 



















































































Quality affected habitations (Sub-Mission)
A. Physical Target (in numbers)
   
  S No. Category Number of Habitation as on 31.01.2006 2005-06 2006-07 2007-08 2008-09 Total
  1 Arsenic 6585 250 742 2649 2017 5658
  2 Fluoride 665 68 200 200 197 665
  3 Salinity 811 85 239 245 242 811
  4 Nitrate            
  5 Iron 11883          
  6 Multiple            
  Total 19944 403 1181 3094 2456 7134
  Note: Arsenic affected habitations already covered = 927
                 
  B Fund requirement (Rs. In Lakh)
    S No. Programme 2005-06 2006-07 2007-08 2008-09 Total
    1 Central Share 5729.23 55260.25 46543.93 11482.53 119015.94
    2 State Share 1909.74 18420.08 15514.64 3827.51 39671.98
    3 12th Finance Commission   20000.00 20000.00 20000.00 60000.00
    Total 7638.98 93680.34 82058.57 35310.04 218687.92
                 
C Arsenic
Sl. No. Year Type of Scheme Cost of Schemes (Rs. Lakh) * Habitations likely to be Covered
1 2005-06 Surface Water Based Piped Water Supply Scheme 59499.77 199
Ground Water Based Piped Water Supply Scheme with ARP 6761.35 25
Ground Water Based Piped Water Supply Scheme without ARP 158.64 20
Provision of ARP in Existing Ground Water Based Piped Water Supply Scheme 838.61 20
Total   67258.38 264
2 2006-07 Surface Water Based Piped Water Supply Scheme 64137.58 7
Ground Water Based Piped Water Supply Scheme with ARP 47329.47 282
Ground Water Based Piped Water Supply Scheme without ARP 1110.49 7
Provision of ARP in Existing Ground Water Based Piped Water Supply Scheme 3354.45 259
Total   115931.99 555
3 2007-08 Surface Water Based Piped Water Supply Scheme   10
Ground Water Based Piped Water Supply Scheme with ARP 13522.71 1974
Ground Water Based Piped Water Supply Scheme without ARP 317.28 50
Provision of ARP in Existing Ground Water Based Piped Water Supply Scheme 2515.84 432
Total   16355.83 2466
4 2008-09 Surface Water Based Piped Water Supply Scheme   1142
Ground Water Based Piped Water Supply Scheme with ARP   564
Ground Water Based Piped Water Supply Scheme without ARP   14
Provision of ARP in Existing Ground Water Based Piped Water Supply Scheme 1677.22 173
Total   1677.22 1893
  * Total value of the scheme to be taken up during the year
Grand Total   201223.42 5178
         
  Habitations Already Covered 603
  Total Arsenic Affected Habitations identified so far 5781
         
D Fluoride
S. No. Year Type of Scheme Cost of Schemes (Rs. Lakh) Habitations likely to be Covered
1 2005-06 Piped Water Supply Scheme with River Bed Tubewell as Source 632.05 48
Piped Water Supply Scheme with Impounding Reservoir/ Check Dam/ Lakes/ Ponds as Source    
Spot Source 0.00 20
Total   632.05 68
2 2006-07 Piped Water Supply Scheme with River Bed Tubewell as Source 0.00 95
Piped Water Supply Scheme with Impounding Reservoir/ Check Dam/ Lakes/ Ponds as Source 0.00 90
Spot Source 0.00 15
Total   0.00 200
3 2007-08 Piped Water Supply Scheme with River Bed Tubewell as Source 0.00 95
Piped Water Supply Scheme with Impounding Reservoir/ Check Dam/ Lakes/ Ponds as Source 0.00 90
Spot Source 0.00 15
Total   0.00 200
4 2008-09 Piped Water Supply Scheme with River Bed Tubewell as Source 0.00 95
Piped Water Supply Scheme with Impounding Reservoir/ Check Dam/ Lakes/ Ponds as Source 0.00 86
Spot Source 0.00 16
Total   0.00 197
 
Grand Total   632.05 665
         
E Salinity
S. No. Year Type of Scheme Cost of Schemes (Rs. Lakh) Habitations likely to be Covered
1 2005-06 Ground Water based Piped Water Supply Scheme with judicious selection of sweet aquifer 438.05 35
Ground Water based Piped Water Supply Scheme with Desalination Plant    
Spot Source 0.00 50
Rain Water Harvesting Structure    
Total   438.05 85
2 2006-07 Ground Water based Piped Water Supply Scheme with judicious selection of sweet aquifer 1202.80 96
Ground Water based Piped Water Supply Scheme with Desalination Plant 0.00 27
Spot Source 0.00 92
Rain Water Harvesting Structure 0.00 24
Total   1202.80 239
3 2007-08 Ground Water based Piped Water Supply Scheme with judicious selection of sweet aquifer 0.00 98
Ground Water based Piped Water Supply Scheme with Desalination Plant 0.00 27
Spot Source 0.00 92
Rain Water Harvesting Structure 0.00 28
Total   0.00 245
4 2008-09 Ground Water based Piped Water Supply Scheme with judicious selection of sweet aquifer 0.00 95
Ground Water based Piped Water Supply Scheme with Desalination Plant 0.00 27
Spot Source 0.00 90
Rain Water Harvesting Structure 0.00 30
Total   0 242
Grand Total   1640.85 811

Up dated on Jan-2007